Construction News
17/05/2022
Beard To Start Work On New Projects In Surrey
Beard has been announced as the preferred bidder to begin work on three new multi-million-pound projects in Surrey.
The three developments are two new children's homes and a family contact centre will provide much-needed community services across the region. The total value of the projects is £4.6m and entails three separate builds. The firm was selected by Surrey County Council.
The first project is the renovation of a vacant site on Ashley Road in Walton-on-Thames which will create a new children’s home. This redevelopment will ensure some of Surrey's most vulnerable young people are cared for within a safe environment which provides for their material needs together with emotional support as they transition into adulthood.
In addition to the children's home, there will be a 'No Wrong Door' facility built as part of the project, providing emergency and temporary accommodation for residents who require rapid placement.
The second project is the £1.4m redevelopment of a site in Epsom into a new children's home. The project includes the demolition of an existing modular centre and construction of a children’s home to the north of the site.
The construction will utilise a Structural Insulated Panel (SIP) system to help make it more energy efficient. SIP panels deliver unrivalled insulation and airtightness, which reduces energy costs over the building’s lifetime.
The third project is a £2.1m new replacement family contact centre for young children in Woking. The Shaw Contact Centre will provide a secure setting for family engagements by providing seven contact rooms of varying sizes, facilitating one-to-one meetings and full family liaison sessions.
The existing centre will be replaced with a new building which will be a combination of one and two storeys. This is to ensure sufficient internal space while minimising massing and responding to the surrounding character of the area, including the nearby conservation area.
The new building will be part one-storey with a flat green roof at the front, and a two-storey block at the rear which will help to break up the built form within their context and maximise the opportunity for ecological diversity.
The projects will be overseen by Pat Hughes, director for Beard's Guildford division, and he explained the designs will provide much-needed services for the local communities.
The three developments are two new children's homes and a family contact centre will provide much-needed community services across the region. The total value of the projects is £4.6m and entails three separate builds. The firm was selected by Surrey County Council.
The first project is the renovation of a vacant site on Ashley Road in Walton-on-Thames which will create a new children’s home. This redevelopment will ensure some of Surrey's most vulnerable young people are cared for within a safe environment which provides for their material needs together with emotional support as they transition into adulthood.
In addition to the children's home, there will be a 'No Wrong Door' facility built as part of the project, providing emergency and temporary accommodation for residents who require rapid placement.
The second project is the £1.4m redevelopment of a site in Epsom into a new children's home. The project includes the demolition of an existing modular centre and construction of a children’s home to the north of the site.
The construction will utilise a Structural Insulated Panel (SIP) system to help make it more energy efficient. SIP panels deliver unrivalled insulation and airtightness, which reduces energy costs over the building’s lifetime.
The third project is a £2.1m new replacement family contact centre for young children in Woking. The Shaw Contact Centre will provide a secure setting for family engagements by providing seven contact rooms of varying sizes, facilitating one-to-one meetings and full family liaison sessions.
The existing centre will be replaced with a new building which will be a combination of one and two storeys. This is to ensure sufficient internal space while minimising massing and responding to the surrounding character of the area, including the nearby conservation area.
The new building will be part one-storey with a flat green roof at the front, and a two-storey block at the rear which will help to break up the built form within their context and maximise the opportunity for ecological diversity.
The projects will be overseen by Pat Hughes, director for Beard's Guildford division, and he explained the designs will provide much-needed services for the local communities.
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a