Construction News
24/06/2022
Pathfindr Develops Smart Worker Safety System Zonr
Asset tracking and Industrial IoT tech specialist, Pathfindr, has announced a smart safety system that creates 'virtual exclusion zones' to protect worker safety in heavy industry, construction and engineering sites, and other hazardous environments.
The new system, called Zonr, was developed in collaboration with one of the UK's leading Rail Contractors the QTS Group. A proximity alarm alerts workers when a vehicle or other hazard comes close, or if they step into a high-risk area – guiding them through a workplace to avoid potential incidents.
It gives site operators real-time data over incursions, enabling interventions to be made in the moment, as well as providing holistic data to enable overall health and safety process to be improved.
Ben Sturgess, Chief Technology Officer at Pathfindr, said: "A high number of workers are killed every year in the workplace just in the UK, and many more seriously injured. While all sites have health and safety measures and policies in place to protect workers, they rely on human accuracy to identify hazards in fast-moving environments – and we're all fallible.
"Zonr has been designed to keep people and machines apart, so that workers can focus on doing their jobs efficiently, knowing they'll be altered to a hazard. No technology will eliminate the need for continual vigilance, but Zonr reduces the risk of a serious incident and helps site operators manage their liability for the safety of site workers."
Easily and affordably deployable in long-term and short-term use cases, the system relies on a combination of GPS tracking and ultra-wideband technology to locate workers and hazards, and create a dynamic virtual barrier – or exclusion zone – around those hazards.
The exclusion zone is created through signals sent between sensors – which can be placed anywhere within a site – and a control unit. The control unit alerts the operator to any incursion, and also lets workers themselves know when they have entered an unsafe zone through a sounded alarm on a wearable device.
Exclusion zones can easily be reconfigured by moving the position of sensors. All setup is completed through a mobile app, and incursion data is easily viewed in real-time via a web-based portal – with data transmitted to the cloud via a 5G connection.
Alan McLeish, Managing Director at QTS Group, said: "At QTS, the safety of our employees is of the utmost importance to us, especially as the railway can be a complex and dangerous environment. Our live sites are dynamic, and no two scenarios are ever identical, which means that ensuring health and safety is an ongoing challenge.
"We've combined our in-depth understanding of the complex ways that railway sites operate with Pathfindr's smart tech expertise to create a solution which has the potential to have a major impact on the way site safety risk is managed."
Zonr is an evolution of Pathfindr's Safe Distancing Assistant, a wearable device to support social distancing, which was launched amid the Covid-19 pandemic outbreak in 2020.
The new system, called Zonr, was developed in collaboration with one of the UK's leading Rail Contractors the QTS Group. A proximity alarm alerts workers when a vehicle or other hazard comes close, or if they step into a high-risk area – guiding them through a workplace to avoid potential incidents.
It gives site operators real-time data over incursions, enabling interventions to be made in the moment, as well as providing holistic data to enable overall health and safety process to be improved.
Ben Sturgess, Chief Technology Officer at Pathfindr, said: "A high number of workers are killed every year in the workplace just in the UK, and many more seriously injured. While all sites have health and safety measures and policies in place to protect workers, they rely on human accuracy to identify hazards in fast-moving environments – and we're all fallible.
"Zonr has been designed to keep people and machines apart, so that workers can focus on doing their jobs efficiently, knowing they'll be altered to a hazard. No technology will eliminate the need for continual vigilance, but Zonr reduces the risk of a serious incident and helps site operators manage their liability for the safety of site workers."
Easily and affordably deployable in long-term and short-term use cases, the system relies on a combination of GPS tracking and ultra-wideband technology to locate workers and hazards, and create a dynamic virtual barrier – or exclusion zone – around those hazards.
The exclusion zone is created through signals sent between sensors – which can be placed anywhere within a site – and a control unit. The control unit alerts the operator to any incursion, and also lets workers themselves know when they have entered an unsafe zone through a sounded alarm on a wearable device.
Exclusion zones can easily be reconfigured by moving the position of sensors. All setup is completed through a mobile app, and incursion data is easily viewed in real-time via a web-based portal – with data transmitted to the cloud via a 5G connection.
Alan McLeish, Managing Director at QTS Group, said: "At QTS, the safety of our employees is of the utmost importance to us, especially as the railway can be a complex and dangerous environment. Our live sites are dynamic, and no two scenarios are ever identical, which means that ensuring health and safety is an ongoing challenge.
"We've combined our in-depth understanding of the complex ways that railway sites operate with Pathfindr's smart tech expertise to create a solution which has the potential to have a major impact on the way site safety risk is managed."
Zonr is an evolution of Pathfindr's Safe Distancing Assistant, a wearable device to support social distancing, which was launched amid the Covid-19 pandemic outbreak in 2020.
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i