Subscribe to our Construction Newsfeed
Uk Construction Directory
Search our 158,281 companies....

Construction News

27/06/2022

First Design Images Unveiled Of Washwood Heath Depot

Construction News Image
The first design images have been revealed of Washwood Heath Depot, HS2's maintenance facility and main control centre for the whole HS2 network, which will create over 550 jobs in the local area.

The site, north east of Birmingham city centre, is where HS2 trains will be maintained, serviced and stored when not in use, and includes the Maintenance Building, Network Integrated Control Centre (NICC) and Cleaners and Drivers Building. All the buildings have been designed to celebrate engineering and provide sustainable working, as well as outdoor amenity spaces for staff.

The design of the buildings provides for a high level of controlled, natural lighting and reduces the need for artificial lighting during the daytime. Solar roof panels, reusing rainwater runoff from some of the building roofs, sustainable drainage, renewable energy, low carbon materials and intelligent lighting provide additional environmental benefits during construction and operation.
-- Advertisement --
hss



Landscape design and green spaces play a key role, with each building having a specifically designed landscape theme, outdoor social spaces for staff, and areas which restore biodiversity and wider habitat connections.

Accessibility for pedestrians and cyclists has been incorporated into the design, with dedicated pedestrian and cyclist routes connecting with Birmingham’s future transport network. In addition to car parks, provision is included for electric vehicle charging points, cycle and motorcycle parking for staff and visitors, and parking for individuals with limited mobility at all depot facilities, alongside taxi and delivery vehicle drop off zones.

The designs have been produced by HS2's Engineering Delivery Partnership (EDP).

Richard Kirkham, HS2's Head of Delivery Project said: "Our design team have been focused on ensuring sustainability is incorporated into our Washwood Heath Depot site and it is a great example of HS2’s environmental ambitions. It’s also a pivotal site providing hundreds of crucial jobs for people in this area of Birmingham, highlighting the long-term economic benefits that HS2 is delivering for the region.

"We're also working closely with Birmingham City Council and other key stakeholders to achieve aspirations for the wider area to the south of the Washwood Heath Depot site which provides the opportunity to create more jobs, connectivity, and environmental benefits."

Latest Construction News

29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham. The project, known as Upper Trinity Street, marks a significant step in the area’s transformation. Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End. The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes. The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand. Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London. The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks. As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF). The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years. A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits. The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager. The geo-environmental specialist, headquartered i
BRICOFLOR UKAqua Direct LtdEfco UK LtdLakeside HireStuart CanvasThink Construction Skills Ltd.T & D Glazing And Installation LimitedCastle & PryorAlphaglazeAndrew Moor Associates