Skanska is trialling a new ground-breaking technology that could be a game changer for the industry.
The Ultimate Cell® is an innovative hydrogen device developed by UTIS®. Not much bigger than a can of baked beans the cell increases the efficiency of vehicles and machinery, reducing fuel consumption and gas emissions, and maximising the benefits of hydrotreated vegetable oil (HVO) fuel.
Powered by the battery or alternator on vehicles and machinery the cell uses an electrolyte to produce a gaseous mixture of hydrogen and oxygen. This electrolyte only needs to be refilled every 30,000 miles or 1,500 hours (for machinery). The hydrogen is fed into the combustion chamber of the machinery or vehicle, making the fuel burn more efficiently.
There are a whole host of benefits to using these cells that optimise internal combustion engines:
Reduced fuel consumption
Reduced harmful exhaust emissions
Reduced fuel bill
Can be used with engines run on gasoline, diesel, biodiesel, ethanol or liquefied petroleum gas (LPG)
Protects the engine's components from damaging carbon deposits.
A short payback period
Small in size and easy to install by a trained mechanic, plant fitter or technician
The cells can be removed and transferred to other equipment when machinery reaches the end of its life
Skanska carried out the initial trial on the M42 J6 highways improvement scheme in February 2022. With three cells installed into an HVO-powered generator the trial’s initial success led to further tests, this time under controlled conditions.
Green Biofuels (GBF), Skanska's HVO provider, carried out the controlled environment testing at Power Electrics facilities in Bristol. The process involved testing three, then six cells installed in a generator powered by HVO fuel and recording the results.
The results of the trial showed a fuel usage saving of between 5-15 per cent when the generator was in use, and up to 40 per cent when idle.
In addition, a trial of a single cell in GBF's new company Land Rover Discovery was carried out and this achieved similar savings - even though the vehicle has the very latest low emissions Euro 6 engine technology.
Multiple cells and much larger single units are available for larger engines used to power heavy plant, trains, ships etc.
Skanska's Senior Procurement Manager Chris Douglas, who discovered the cell via LinkedIn and then reached out to the supplier said: "Having the opportunity to take this initial discovery and bring it to life with the backing of Skanska is very exciting. So much can be achieved when we work together and support our supply chain. Ultimate Cell is a small business and it’s brilliant that we are able to support their development and help shape a sustainable future for all."
Construction News
25/07/2022
Skanska Trials New Ground-Breaking Technology


25/04/2025
Aston Villa Football Club has unveiled plans to refurbish and expand the iconic North Stand at Villa Park, a major step in the wider regeneration of the North Grounds.
The redevelopment will raise the stadium's total capacity to over 50,000, with the North Stand alone increasing to more than 12,00

25/04/2025
Morgan Sindall Construction's Southern Home Counties team has officially handed over the newly completed Crawley Innovation Centre to Crawley Borough Council (CBC).
The transformation of the former TUI travel house into a cutting-edge innovation, economic and technology hub drew local leaders, busi

25/04/2025
Clowes Developments has confirmed that construction will soon commence on five new trade counter, warehouse and industrial units at Stud Brook Business Park in Castle Donington, following planning approval from North West Leicestershire District Council.
The new development, Plot 1, will feature fi

25/04/2025
A historic 18th-century landmark has been carefully restored as part of the major Garendon Park housing development in Loughborough.
The Grade II* listed Obelisk, located within the grounds of the former Garendon Hall estate, had endured years of weathering before undergoing a sensitive restoration

25/04/2025
Mace has appointed industry heavyweight, Gary Sweeney, to head up its European team working across the Healthcare, Life Sciences and Technology sectors.
Gary joins Mace following a spell as Interim Director in Turner & Townsend’s Advanced Manufacturing, Industrial and Logistics division in the UK

25/04/2025
A groundbreaking ceremony has recently marked the start of a £5.5 million extension project at Thorp Academy in Ryton, Gateshead.
The development, aimed at accommodating the growing student population, is being delivered by Morgan Sindall Construction on behalf of the Northern Education Trust (NET

25/04/2025
Wakefield-based Henley Stone Specialists has been appointed to deliver Glass Reinforced Concrete (GRC) elements for the first phase of 'Our Cultural Heart', Kirklees Council’s flagship project aimed at revitalising Huddersfield town centre.
Part of the Henley Construction Management Group, Henley S

25/04/2025
More than 2,500 Nottingham homes are set to benefit from energy efficiency improvements as part of a major £153 million regional initiative to cut household bills and carbon emissions.
Nottingham City Council's Executive Board has approved the acceptance of nearly £76 million in Government funding

25/04/2025
Introduction: What Is a Fitted Hoist?
A fitted hoist is a mechanical lifting device installed in the home to help safely move individuals with limited mobility. Commonly found in bedrooms, bathrooms and living spaces, these systems make it easier and safer to transfer someone between a bed, chair,

25/04/2025
Rail services between Hereford and Shrewsbury are facing significant disruption following the collapse of an underground culvert, forcing the closure of the line in both directions.
Emergency engineering works are underway to ensure the safety of the railway.
Network Rail's engineering teams are