Leading modular housing pioneer ilke Homes has entered into a land led package deal with Orbit Homes to deliver 140 affordable homes in Harrow Lane, Hastings.
Hastings Borough Council granted Reserved Matters Approval for the 12.4-acre site in March 2022. Out of the 140 homes being delivered, 84 are to be delivered as zero-carbon, meaning they will emit no operational emissions via utilities such as electricity and heating. Each of the homes will be fitted with an air source heat pump (ASHP) and solar panels which, when combined, will provide clean energy.
The entire scheme - which will deliver a mix of apartments and houses, ranging in sizes from one to four bedrooms homes - will be gas-free, running on renewable power generated from the ASHPs and solar panels which will combine to help heat the home more sustainably.
The announcement marks the second time ilke Homes has partnered with Orbit Homes, having already delivered 25 homes for the housebuilder in Wellesbourne, Warwickshire. Orbit Homes, which creates and builds diverse, multi-tenure developments across the Midlands, East and South East of England, opted to use modern methods of construction (MMC) due to the significant speed, quality and energy-efficiency benefits that ilke Homes' advanced offsite manufacturing techniques deliver.
Acting as a full turnkey developer, ilke Homes has been responsible for securing the land and gaining planning permission and will now manufacture the homes and develop the site. Once complete, Orbit Homes will own or manage all 140 homes.
Following a competitive tender process, Hastings Borough Council chose ilke Homes to develop the site in October 2021 due to the company's ability to demonstrate best value, accelerated delivery and high levels of sustainability. The 140 homes will be delivered as 100% affordable tenure, comprising 70 shared ownership homes and 70 affordable rent homes.
House prices in Hastings have reached record highs in recent months, so ramping up the delivery of more affordable homes is deemed vital by both the council and local stakeholders. Overall, sold prices in Hastings over the last year were 4 percent up on the previous year and 22 percent up on the 2019 peak of £241,129.
Precision-engineering techniques mean that ilke Homes will be able to deliver the 140 affordable homes in half the time of traditional methods, thanks to most of the construction stage taking place offsite. By manufacturing offsite, the homes delivered will be of the highest quality, as ilke Homes is able to benchmark standards at numerous stages of the build cycle.
Works are expected to start on site in autumn 2022, with the first homes being installed in summer 2023. Completion of the scheme is expected in 2024.
Tom Heathcote, Executive Director of Development at ilke Homes, said: "We have enjoyed working closely with Hastings Borough Council's Estates Team and the local authorities Planning Department to bring forward our proposals for the site at Harrow Lane. Subject to the clearance of pre-commencement conditions, we are excited to commence on site later this year. ilke Homes is proud to be delivering an entirely gas-free scheme, with 84 of the homes to be delivered as zero-carbon for our partner of choice, Orbit Homes. As a company, we continue to pioneer a sustainable and future proofed housing typology in response to the climate crisis."
Cllr Maya Evans, deputy leader and portfolio holder for housing, commented: "We are absolutely delighted with the progress of this project, we are providing affordable homes for local people, alongside addressing the climate emergency. We are very impressed with ilke Homes who have gone above and beyond in ensuring 84 homes are zero carbon, this means the energy they use will be 100% renewable, on top of fabric first sustainable building materials. Hastings Borough Council are now seeing the fruits of our vision, to provide high quality homes for people on low incomes, while playing an active role in reducing carbon emissions for our town. This is a very proud moment and just the start of more to come."
Helen Moore, Group Director of Orbit Homes, said: "We are delighted to be working in partnership with ilke Homes, to deliver a mix of affordable rent and shared ownership properties in Hastings; which is a core area of operation for us. The delivery of off-site modular homes, which boast energy-efficient and environmentally friendly credentials, aligns with our 2025 Strategy to increase the number of affordable homes we deliver utilising Modern Methods of Construction.
"The 84 net carbon zero homes will not only support our Orbit Earth initiative which seeks to minimise the impact of our activities but will also allow us to fully evaluate and then articulate the benefits to our customers of living in a net zero carbon new build home."
Time and date
CONSTRUCTION DIRECTORY
Construction News
01/08/2022
ilke Homes Partners With Orbit Homes For Hastings Development
Latest Construction News
21/11/2024
Europe's leading online cleanroom consumables supplier, Cleanroomshop, has recently launched a brand-new website, giving its users an improved user experience. The new website continues to offer over 2,000 products from more than 40 brands, whilst incorporating a new look and more efficient ...
21/11/2024
At Ecomerchant, we offer a carefully curated selection of sustainable weatherproofing solutions, including natural lime renders, mineral finishes, and vapour-open waterproofing materials. They help prevent structural damage while ensuring your building can breathe naturally. Our eco-friendly ...
20/11/2024
Construction firm Willmott Dixon has partnered with Westminster City Council on a £36 million project to restore the historic Seymour Centre in Marylebone, a Grade II listed building dating back to the 1930s. The project, procured through the SCF framework, will see the three-storey centre undergo ...
20/11/2024
The Hill Group has commenced work on a new development in Billericay, Essex, which will deliver 179 high-quality homes across a 20-acre site. Designed to blend with Billericay's scenic countryside while addressing the pressing demand for sustainable housing, the project is located on Kennel Lane ...
20/11/2024
Extensive groundwork is underway for a new housing development in Maidstone, where Vistry Group, in partnership with Legal & General Affordable Homes, is set to build 272 properties on the site of the former Tovil Quarry off Farleigh Hill. The project will include 37 affordable homes for low-cost ...
20/11/2024
Stonewater has scooped a new energy efficiency retrofit contract with compliance and energy services provider Correct Contract Services. This work, funded through the Social Housing Decarbonisation Fund (SHDF) Wave 2, will include a range of energy-saving upgrades. Measures such as loft ...
20/11/2024
Kier has been appointed by Cambridgeshire County Council to deliver building, mechanical, and electrical maintenance services across the Council's portfolio of 160 corporate buildings. The contract, which began in November 2024, will run until 2027, with the possibility of two one-year extensions ...
20/11/2024
Builders use water for various functions on the job, they utilise this resource for worker hygiene, hydration, concrete batching, grouting, dust suppression, drilling and piling. If companies mismanage this water use, they can increase their environmental impact. When the industry comes ...
20/11/2024
Edmond Shipway has been appointed to a pioneering initiative tackling homelessness in Greater Manchester, providing project management and cost consultancy services on the second phase of Embassy Village. Set to deliver 40 purpose-built homes for men facing homelessness in Manchester, Embassy ...
20/11/2024
West Sussex County Council is inviting residents to share their views on proposed transport improvements at the Hazelwick and Tushmore junctions on the A2011 Crawley Avenue. The proposals aim to make walking, cycling, and public transport more appealing for short journeys. This initiative is part ...