Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,098 companies....

Construction News

12/09/2022

HS2 Reaches Milestone On Environmental Project

Construction News Image
HS2 is celebrating its first million cubic metres of chalk laid as part of Chiltern grassland transformation.

The environmental project will eventually see 2.6 million cubic metres of chalk excavated during the construction of the 10 mile long tunnels used to create one of the largest areas of chalk grassland in the Chiltern hills.

Instead of removing the material by road, it is being used to landscape the site as part of plans to create 127 hectares of new chalk grassland, woodland, wood pasture and wetland habitats.

HS2 Ltd's Environment Director Peter Miller said: "The south portal project is one of the most important parts of our Green Corridor programme to establish better connected, sustainable and biodiverse landscapes along the route of the new railway and will contribute substantially to HS2’s carbon reduction target.

"It's great to see how much chalk has already been laid on site and I look forward to seeing the site completely transform over the coming years."

Chalk grassland is habitat of international conservation importance mainly found on limestone and chalk downlands of south-east England and the Isle of Wight.

Lime-rich, but low in nutrients, the thin soil holds little water and drains well. These conditions encourage a huge variety of smaller herbs and wildflowers and over 40 plant species can be found in one square metre of grassland, including some of the UK's rarest orchids as well as highly diverse invertebrate populations. Only 700 hectares of chalk grassland exist across the whole of the Chilterns AONB.
-- Advertisement --
hss



The plans have been developed by HS2’s main works contractor, Align – a joint venture formed of three international infrastructure companies: Bouygues Travaux Publics, Sir Robert McAlpine, and VolkerFitzpatrick – working with its design partners Jacobs, Rendel-Ingerop, and LDA Design, that form Align D.

Chris Chantler, Align D, Design Director, said: "This innovative, multi-discipline project is providing a unique opportunity to create a huge expanse of new grassland using chalk being excavated from the Chiltern tunnels.

"With the first million cubic metres of chalk having already been placed to create the grassland, we are well on the way to creating a landscape which will be both rich in diversity and a place for people to explore and connect with the natural environment."

Two giant tunnelling machines – named Florence and Cecilia – are currently around 4 miles into their journey under the Chilterns. The material they excavate is mixed with water to form a slurry before being pumped out of the tunnel.

It is then processed at a slurry treatment plant at the south portal site where the flint is removed and water extracted, to leave chalk cake which is then carefully laid out on site – together with recycled concrete and aggregates from construction works - in order to create a naturalistic landscape with all the temporary construction buildings removed.

Ninety hectares of chalk grassland will be seeded into re-profiled soil layers. This will sit alongside new areas of woodland, wood pasture and wetlands, including almost 65,000 trees and shrubs of 32 species and nearly 3.5km of new hedgerows.

Around 4.5km of new footpath, cycling and horse-riding routes will give the public areas to large parts of the site, which sits between the Colne Valley Regional Park and the Chilterns AONB.

Field trials are in preparation ahead of final seeding, and planting of trees and shrubs in 2025.

Latest Construction News

25/04/2025
Aston Villa Football Club has unveiled plans to refurbish and expand the iconic North Stand at Villa Park, a major step in the wider regeneration of the North Grounds. The redevelopment will raise the stadium's total capacity to over 50,000, with the North Stand alone increasing to more than 12,00
25/04/2025
Morgan Sindall Construction's Southern Home Counties team has officially handed over the newly completed Crawley Innovation Centre to Crawley Borough Council (CBC). The transformation of the former TUI travel house into a cutting-edge innovation, economic and technology hub drew local leaders, busi
25/04/2025
Clowes Developments has confirmed that construction will soon commence on five new trade counter, warehouse and industrial units at Stud Brook Business Park in Castle Donington, following planning approval from North West Leicestershire District Council. The new development, Plot 1, will feature fi
25/04/2025
A historic 18th-century landmark has been carefully restored as part of the major Garendon Park housing development in Loughborough. The Grade II* listed Obelisk, located within the grounds of the former Garendon Hall estate, had endured years of weathering before undergoing a sensitive restoration
25/04/2025
Mace has appointed industry heavyweight, Gary Sweeney, to head up its European team working across the Healthcare, Life Sciences and Technology sectors. Gary joins Mace following a spell as Interim Director in Turner & Townsend’s Advanced Manufacturing, Industrial and Logistics division in the UK
25/04/2025
A groundbreaking ceremony has recently marked the start of a £5.5 million extension project at Thorp Academy in Ryton, Gateshead. The development, aimed at accommodating the growing student population, is being delivered by Morgan Sindall Construction on behalf of the Northern Education Trust (NET
25/04/2025
Wakefield-based Henley Stone Specialists has been appointed to deliver Glass Reinforced Concrete (GRC) elements for the first phase of 'Our Cultural Heart', Kirklees Council’s flagship project aimed at revitalising Huddersfield town centre. Part of the Henley Construction Management Group, Henley S
25/04/2025
More than 2,500 Nottingham homes are set to benefit from energy efficiency improvements as part of a major £153 million regional initiative to cut household bills and carbon emissions. Nottingham City Council's Executive Board has approved the acceptance of nearly £76 million in Government funding
25/04/2025
Introduction: What Is a Fitted Hoist? A fitted hoist is a mechanical lifting device installed in the home to help safely move individuals with limited mobility. Commonly found in bedrooms, bathrooms and living spaces, these systems make it easier and safer to transfer someone between a bed, chair,
25/04/2025
Rail services between Hereford and Shrewsbury are facing significant disruption following the collapse of an underground culvert, forcing the closure of the line in both directions. Emergency engineering works are underway to ensure the safety of the railway. Network Rail's engineering teams are
Stuart CanvasAqua Direct LtdEfco UK LtdT & D Glazing And Installation LimitedLakeside HireSurrey Basements LtdIMS Heat PumpsInsulationuk.co.ukThe UFH GroupTuffshop (Top Brands in Workwear)