What's New in TG20:21
Posted by Matthew Robinson
TG20 is a guide to good practice for tube & fittings scaffolds produced by the NASC. The latest version of this guidance TG20:21 builds on the previous version TG20:13. There are a number of differences between TG20:13 & TG20:21. Perhaps the biggest change is in the way the new guide is delivered. Previously TG20:13 was outlined in two physical books, the TG20:13 Operational Guide & the TG20:13 Design Guide. These were accompanied by the TG20:13 e-guide software for producing the TG20 compliance sheets, but the software was only licensed for use on one machine. For TG20:21 the Operational Guide, Design Guide & e-Guide software have all been incorporated into a subscription based online portal called the NASC e-Portal. This allows for several devices including computers, tablets & smart phones to access the guide with one subscription.
There are a number of changes within the guide itself & the e-Guide software has also been updated to allow TG20 compliance sheets for a wider range scaffolds. Below is a list of some of the changes that have been made. Although this list is not exhaustive, we have tried to include the most important changes. A full list of the changes are listed within TG20:21 itself.
TG20:21 eGuide Software
As mentioned above, the e-Guide software has been updated to include a wider range of scaffolds. Also, each TG20 compliance sheet produced by the software is now more detailed. The layout of a TG20:21 compliance sheet now spans over two pages with an illustration of the scaffold and the main compliance criteria on the first page, with more detailed compliance criteria on the second page.
Some of the additional TG20 compliant scaffolds that have now been added within software include tied independent scaffolds with up to three inside boards, external birdcages, mobile towers and loading bays without the need to use beams. Loading bays with beams have also been modified to replace the 5 board width with the options for either a 6+2 board width or a 3+4+3 board width. The compliance sheet for birdcage scaffolds has been improved to allow for multiple boarded lifts as well as the option for just the perimeter bays to be boarded.
Operational Guide
Below is a list of the key changes that have been made with in the Operational Guide.
The guidance for the maintenance of scaffold boards has been revised in line with TG6:17
The guidance for supplementary and check fittings from TG14:20 has been included.
Additional guidance has been provided for the use of TG20 compliant aluminium lattice beams as well as practical guidance for the storage and transportation of beams.
Guidance on ladders has been updated following the introduction of BS EN 131
Guidance for when sole boards should be used in addition to plastic plates has been clarified.
Scaffold load classes and permissible platform widths have been updated to permit three inside boards
Guidance for board bearing transoms has been extended to include three inside boards
Guidance for structural transoms has been revised to state they may be connected to standards or ledgers.
Guidance for inside board brackets has been amended to permit up to three inside boards.
For tie assemblies, guidance has been provided for the use of K bracing where a tie tube is more than 300mm from a standard.
For ladder towers the maximum recommended vertical distance between landings has been reduced from 9.0m to 6.0m in line with SG25:20
The guidance for the safe use of gin wheels has been revised in line with SG9:21
The guidance on Loading Bays has been revised to include the additional width options within the TG20:21 compliance sheets
Guidance has been provided for external birdcages in addition to internal birdcages as per TG20:13
Guidance has been provided for TG20:21 compliant mobile towers
The Risk Assessment & Method Statement section has been updated in line with SG7:19.
Request A Quote
Construction News
15/09/2022
Access Design & Safety Blog


29/04/2025
Construction has officially begun on a new £13 million luxury care home in Wavendon, near Milton Keynes.
The project, led by contractor Clegg Construction, will deliver a state-of-the-art, three-storey, 96-bed facility for Hampton Healthcare, a subsidiary of the Rochmills Group.
The new care home

29/04/2025
Latimer, the development arm of Clarion Housing Group, has officially broken ground on its flagship northern site, Dyecoats, marking a major milestone in one of the most significant regeneration projects in Leeds.
The scheme will deliver more than 1,600 new homes and generate up to £300 million in

29/04/2025
Leeds United Football Club has revealed proposed design images for the long-anticipated redevelopment of Elland Road, marking a significant step forward in modernising the historic stadium.
The visual concepts follow the club's initial announcement in September 2024 outlining ambitions to enhance a

29/04/2025
Galliford Try’s Building London and South East Commercial business has officially completed the redevelopment of 127 Charing Cross Road, handing over the mixed-use scheme to client Nomura Real Estate Development and development manager Lothbury Investment Management.
Located at 127-133 Charing Cros

29/04/2025
Camden Council's planning committee has approved plans for the refurbishment of EDGE Shaftesbury, also known as the 125 Shaftesbury Avenue scheme, in a major boost for Central London’s office market.
The project is being led by Edge and Mitsubishi Estate London.
The redevelopment will transform

29/04/2025
Pupils at St Oswald's Catholic Primary School in Coppull were given a fun and educational experience this month as local housebuilder Story Homes hosted a special classroom workshop to promote construction site safety.
Just five minutes from the school, Story Homes' Elmbrook Park development provid

29/04/2025
Morgan Sindall Construction has been appointed as the main contractor for the highly anticipated Brunswick Wharf development in Bideford, Devon.
The scheme, led by developer Red Earth, will revitalise a long-neglected part of the town's historic riverside, delivering more than 100 new apartments,

29/04/2025
Wates Group has announced the appointment of James Saunders as its new Chief People Officer, succeeding Paul Rowan, who will retire at the end of 2025 after more than a decade with the company.
Saunders will officially take up the role on 6 May 2025 and will join the company’s Executive Committee.

29/04/2025
Perega has announced the appointment of Nick Simmonds as Associate Building Surveyor, marking a significant step in the consultancy's expansion of its building surveying services across the UK.
With a well-established presence in the North, this strategic hire sets the foundation for Perega’s first

29/04/2025
Hattersley's ongoing transformation continues to gather momentum, with the past year bringing major developments in housing, employment, public space improvements, and community services.
The regeneration is being delivered through a partnership between Tameside Council, Onward Homes, and Homes En