Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,970 companies....

Construction News

23/01/2023

SLPN Leads The Way On Net-Zero Development

Construction News Image
SEGRO Logistics Park Northampton (SLPN) will be the company's first UK big-box logistics park to achieve net-zero carbon in the construction of all the units and delivery of the supporting infrastructure as a result of a pioneering partnership with primary contractor Winvic Construction Ltd.

SLPN will deliver up to 5 million sq ft of modern distribution space and a new 35-acre rail freight terminal, and is adjacent to Junction 15 of the M1, close to Northampton. The development, which is expected to support over 7,000 jobs, also includes significant infrastructure improvement works, including a bypass of Roade village, improvements to the A45 and M1 Junction 15 and extensive landscaping including new cycle routes and footpaths.

SEGRO and Winvic will deliver the entire project, including all infrastructure and enabling works, at net-zero carbon. This will be achieved through a number of innovations in the construction and procurement processes to reduce the amount of embodied carbon in the base build by approximately 40%, with any outstanding carbon being offset. Initiatives include:
-- Advertisement --
hss



• Use of recycled and low-carbon materials

• Recycled milk bottles are being utilised for the site’s drainage system – 1,108,430 have been used to date, achieving a 90% carbon saving.

• Salvaged materials, including brick, metals, broken concrete and wood are being utilised across the development.

• All materials – almost five million cubic metres – have been retained on site for landscaping bunds which has resulted in a saving of 7,978 tonnes of carbon.

• Shift to green and renewable power

• The construction site is powered by hybrid generators, saving 12 tonnes of carbon per week versus 100% diesel.

• Vehicles are powered by green diesel (a Hydrogenated treated Vegetable Oil): over 250,000 litres have been used to date, saving 607 tonnes of carbon

• Concrete used on site has on average 35% less carbon than traditional mixes

• All steel used will have at least 30% recycled content

• Reduction of on-site waste

• An onsite concrete batching plant means concrete is produced to exact quantities and specifications required, significantly reducing waste and carbon emissions created through transportation

In line with the company's Responsible SEGRO commitment to be net-zero carbon by 2030, the scheme has been designed to reduce the amount of embodied carbon as far as practically possible. The carbon that can’t be removed will be offset through a variety of initiatives that will be focused around social value, ecology and renewable energy. These include peat bog restoration in the North East of the UK, a carbon farming project in Somerset and several tree planting schemes. An initial 165,000 Verified Carbon Standard carbon credits have been purchased. SEGRO’s current priority is to reduce carbon emissions, however the company is simultaneously developing its carbon offsetting strategy. The learnings from SEGRO Logistics Park Northampton will inform this strategy.

Latest Construction News

01/04/2025
Galliford Try's Building East Midlands business has officially broken ground on a £63 million Single Living Accommodation (SLA) project at RAF Digby, Lincolnshire. The historic base, the Royal Air Force's oldest station established in 1918, will see the construction of four new Junior Ranks SLA bu
01/04/2025
The regeneration of Nottingham city centre has taken a significant step forward following an agreement for Homes England to acquire the Broad Marsh site from Nottingham City Council. As the Government's housing and regeneration agency, Homes England will take ownership of the former shopping centre
01/04/2025
Work has officially commenced on Morgan Sindall Construction's latest education project in Greater Manchester, the permanent home for Star Radcliffe Academy, a five-form entry secondary school with space for 750 students aged 11-16. Operated by Star Academies, one of the UK’s highest-performing mul
01/04/2025
The UK's construction industry is experiencing a significant upturn, driven by ambitious government initiatives to build 1.5 million homes and undertake major infrastructure projects. This surge has spotlighted a critical challenge: the need for a skilled workforce to meet escalating demands. Rece
01/04/2025
Plans to acquire 10 two-bedroom homes in the village of Hook have been approved by Pembrokeshire County Council’s Cabinet Member for Housing. The purchase, supported by Welsh Government funding, will see the council secure the properties from Kooner Properties Ltd, which is currently developing the
01/04/2025
The relocation and expansion of Fred Nicholson School took a major step forward as pupils visited the construction site and participated in a ceremonial steel signing. The school, which serves children and young people aged 7 to 16 with special educational needs and disabilities (SEND), is moving f
01/04/2025
Castlemere Developments has appointed Ryan Morrissey as project manager to oversee its legacy and new developments. The 34-year-old will bring a wealth of experience to the Windsor-based company, which has a number of ongoing projects across London and the south east. Morrissey's most recent role
01/04/2025
Rail passengers traveling across the Pennines over the Easter weekend are being urged to plan ahead as major upgrade work between Huddersfield and Dewsbury is set to impact train services from Saturday 19 to Monday 21 April. As part of the Transpennine Route Upgrade (TRU), engineers will be carryin
31/03/2025
GMI Construction Group has announced the practical completion of Citylabs 4.0, a cutting-edge 125,000 sq. ft laboratory and workspace development, further solidifying Manchester’s position as a leader in life sciences and healthcare technology. Developed in partnership with Bruntwood SciTech and Ma
31/03/2025
Kier has completed the construction of HMP Millsike for the Ministry of Justice, increasing prison capacity by approximately 1,500 and marking a significant milestone in the UK’s prison infrastructure. The facility was officially opened by Lord Chancellor and Secretary of State for Justice, Rt. Hon
Aqua Direct LtdLakeside HireEfco UK LtdBRICOFLOR UKStuart CanvasT & D Glazing And Installation LimitedFifty Five ResinsNationwide Louvre CompanyMetal Sheets LtdSteel Express