Construction News
14/02/2023
Hayfield Reveals Plans To Build 50 Homes In Gloucestershire
Housebuilder Hayfield has submitted a Reserved Matters Application to Tewkesbury Borough Council to develop 50 new homes in the Village of Gotherington, Gloucestershire.
The £35m, 6.27 hectares scheme, just north of Bishops Cleeve, will deliver a range of two, three and five-bedroom EPC A-rated homes and bungalows, which will add aesthetic variety to the neighbourhood, as well as meet continued market demand for single floor properties.
Hayfield will take a tenure-blind approach to delivery, with a total of 20 of the plots designated for affordable housing and the rest for open-market sale.
The development will be fossil-fuel free and achieve the gold standard for energy efficiency. Each home is to include solar PV panels, an air source heat pump, energy-efficient underfloor heating, increased insulation, water efficiency measures and electric vehicle charging point. These sustainability factors are in line with Hayfield’s A-rated, zero-carbon-ready design principles, which already exceed the government’s Future Homes Standard – a level of specification that will be mandatory for housebuilders to meet from 2025.
Andy Morris, Managing Director of Hayfield, said: "Our vision for this scheme has been to demonstrate how impressive a sustainable development can look and the positive impact it can achieve for local communities.
"That's why in designing this scheme, not only have we harmonised our signature house designs to be in keeping with the village's existing architecture, but to also introduce sustainable measures that will enable future residents to significantly lower their carbon footprint and household energy usage."
The scheme's design has been inspired by the character of Gotherington’s existing properties, with care taken to ensure the new homes complement the village in an organic, sustainable way. Materials chosen, including stone, reflect those used throughout the existing village. A new access road and a network of footpaths will be created from Ashmead Drive incorporating the existing Public Rights of Ways.
Particular attention has equally been paid to the natural environment. Prioritisation of biodiversity will see new habitats for wildlife incorporated, with native tree planting and an attenuation pond and wetland wildflowers added, while the vast majority of existing trees and hedgerows will also be retained and enhanced. The site will deliver a biodiversity net gain.
The £35m, 6.27 hectares scheme, just north of Bishops Cleeve, will deliver a range of two, three and five-bedroom EPC A-rated homes and bungalows, which will add aesthetic variety to the neighbourhood, as well as meet continued market demand for single floor properties.
Hayfield will take a tenure-blind approach to delivery, with a total of 20 of the plots designated for affordable housing and the rest for open-market sale.
The development will be fossil-fuel free and achieve the gold standard for energy efficiency. Each home is to include solar PV panels, an air source heat pump, energy-efficient underfloor heating, increased insulation, water efficiency measures and electric vehicle charging point. These sustainability factors are in line with Hayfield’s A-rated, zero-carbon-ready design principles, which already exceed the government’s Future Homes Standard – a level of specification that will be mandatory for housebuilders to meet from 2025.
Andy Morris, Managing Director of Hayfield, said: "Our vision for this scheme has been to demonstrate how impressive a sustainable development can look and the positive impact it can achieve for local communities.
"That's why in designing this scheme, not only have we harmonised our signature house designs to be in keeping with the village's existing architecture, but to also introduce sustainable measures that will enable future residents to significantly lower their carbon footprint and household energy usage."
The scheme's design has been inspired by the character of Gotherington’s existing properties, with care taken to ensure the new homes complement the village in an organic, sustainable way. Materials chosen, including stone, reflect those used throughout the existing village. A new access road and a network of footpaths will be created from Ashmead Drive incorporating the existing Public Rights of Ways.
Particular attention has equally been paid to the natural environment. Prioritisation of biodiversity will see new habitats for wildlife incorporated, with native tree planting and an attenuation pond and wetland wildflowers added, while the vast majority of existing trees and hedgerows will also be retained and enhanced. The site will deliver a biodiversity net gain.
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a