Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,820 companies....

Construction News

01/03/2023

Leeds City Rail Station's Main Entrance To Be Transformed

Construction News Image
Work on the next stage to transform Leeds City Rail Station's main entrance and surrounding area is to commence in March.

The Leeds Station Sustainable Travel Gateway scheme will create an improved and more people-friendly environment which can accommodate growing rail passenger numbers, and ensure people can enter and exit the station safely.

A total of £46.1 million is being invested in the scheme, which is being delivered by Leeds City Council on behalf of Network Rail as the landowner, and in partnership with the West Yorkshire Combined Authority.

Advance works and preparations have been underway since last May, and major improvement work from early March will include:

• Pedestrianising New Station Street, including the section which meets Boar Lane, with outdoor seating and rest areas, and landscaping.

• Relocating the existing taxi rank to Bishopgate Street where there will be a large and well-lit shelter and room for six vehicles, also allowing for kerb-side boarding which will help people with wheelchairs or assistance dogs to board more easily.

• Two 21-passenger lifts from Bishopgate Street to the station entrance on New Station Street, providing step-free access between the two streets.
-- Advertisement --
hss



• A high quality cycle hub at the station, which will include electric charging points and storage for all types of cycles.

• Environmental improvements to Neville Street and Dark Neville Street including enhanced lighting, road surface and pavement and elevation treatments.

• Installing high quality cycle infrastructure on Bishopgate Street and Neville Street, and improvements to cycling infrastructure in surrounding communities.

Since securing planning permission for the scheme, Leeds City Council and Network Rail have been working together to combine the Sustainable Travel Gateway scheme with a separate project which will see Network Rail reinforce the underground structure below New Station Street which supports much of the station above it.

Delivering the two schemes in tandem will mean less disruption in the long-term and also reduces the need to revisit the Sustainable Travel Gateway scheme at a later date if further works are required as part of Network Rail’s scheme.

In May, as part of Network Rail’s scheme the taxi rank will be moving to Princes Square. Network Rail are currently liaising with private hire and hackney carriage services with details of the arrangements.

May will also see the northern section of New Station Street from the station’s main entrance towards City Square will be closed to vehicles (except service vehicles and emergency services) and pedestrians to allow paving works to be carried out. Pedestrians will still be able to walk towards Boar Lane from the main entrance, or use the station’s northern entrance.

The full programme of improvements including the Sustainable Travel Gateway Scheme and the Network Rail works is due to be completed by September 2025.

Cllr James Lewis, Leader of Leeds City Council, said: "We are delighted to begin these improvements in earnest, creating a gateway to our city that meets the current and future needs of everyone who uses the station.

"Our railway station plays a key role in the North of England’s rail connectivity, so it is vital that we provide a much better experience and capacity for station users as we prepare to welcome further investment in our region's rail network including the Transpennine Route Upgrade and Northern Powerhouse Rail."

Latest Construction News

05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre. The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area. The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic. The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre. The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment. The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes. The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road. The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall. Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs. The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund. The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a
Stuart CanvasBRICOFLOR UKT & D Glazing And Installation LimitedThink Construction Skills Ltd.Aqua Direct LtdEfco UK LtdLakeside HireLandscaping CambridgeMy Thread Curtains(London) Builder Cambridge Ltd