X-Grid is the ultimate in gravel retention grid.
It is a highly versatile gravel grid product with a wide range of uses; from golf and leisure, landscaping, car parks, a base for garden buildings and use on farms.
But it is perhaps driveways where it is best known. It can be used to create a permeable, SUDS compliant solution that can be withstand the heaviest vehicles.
Himsley Field Cottage in Dudley, West Midlands was the latest property to use X-Grid for this purpose. We spoke to Paul Rudge to find out why it was suitable.
Easy and quick to install gravel grid
Paul needed a gravel grid solution for Himley Field Cottage and undertook thorough research to ensure he had the best grid for the job.
He told us: "I looked at seven gravel grid products including yours and samples from all parties. After looking at them all I decided to go with the X-Grid mainly because of the size. I preferred the smaller squares especially when doing cuts, and I did like the fact they came assembled.
"GCL's costs were towards the top of the seven products, but it reflected quality. I had two more expensive than the GCL X-Grid, but they were much heavier duty and designed for lorry parks. Four were cheaper, two were poorer quality and the other two were well made and made me look hard before deciding.
"The reason I decided to buy the X-Grid was the quality. It is a well made product that is fitted together very well and it was very easy and quick to lay.
"The staff at GCL were very friendly and well informed on the product and I preferred the pattern."
X-Grid holds the gravel firmly in place
X-Grid is perfect for preventing gravel migration and this was ideal for Paul.
He continued: "I have had gravel drives before and understand gravel moves when driven over, but now with the X-Grid nothing moves, it creates a firm surface to walk and drive over.
"The finished article is even better than I thought, so I'm very pleased."
Made to withstand vehicle weight
X-Grid has a load capacity of 428 tonnes per square metre so it can withstand vehicle weight.This immense compressive strength means the driveway can handle almost anything.
It is low maintenance and means surface maintenance expenditure can be saved.
It is weather-resistant and does not rot or degrade. It is also resistant to the effects of UV weathering and will not change colour or become brittle with UV radiation.
Good for the environment
X-Grid is eco-friendly made from 100% recycled plastic which has been sourced in the UK. It means X-Grid can remove plastic waste from landfill and can be fully recycled at the end of its usable life.
It is a highly permeable alternative to tarmac and concrete surfaces. The nature of the grid allows water to pass through the structure and into the sub-base below – which helps to reduce surface water run-off. This helps to mitigate the effects of severe rainfall by locking groundwater into the sub-base for it to gradually soak away, diverting water from the sewer system.
Very impressed
Paul commented how contractors for the installation at the cottage were very pleased with the gravel grid.
"The company I used to lay the product before and were very impressed with how easy it was to use and how it was when finished.
"My contractors have secured two more jobs using gravel grids from this project, and will also be offering this an alternative to other projects they have going forward."
Find out more
To read about X-Grid being used as a car parking solution click here.
To read more case studies click here.
Speak to a member of our helpful and friendly customer service team on 01246 418144 or contact us here to find out about the X-Grid and other gravel grids in our range.
Click here for further information.
www.gclproducts.co.uk
Time and date
CONSTRUCTION DIRECTORY
Latest Construction News
20/12/2024
Norwich City Council has acquired the Anglia Square Shopping Centre, paving the way for a transformative redevelopment of the prominent city site. This marks a key milestone in the Council's plan to rejuvenate the area, creating a vibrant hub with approximately 1,100 new homes, business ...
20/12/2024
SSE Energy Solutions (SSE), has signed an agreement to collaborate with Darlington Borough Council (DBC) to support the development of a town-wide heat network. While the project is in the early stages of development, SSE's current plans include constructing an Energy Centre containing large air ...
20/12/2024
Hubexo has opened its new UK and Ireland office, located next to the iconic Blackfriars Bridge in central London. The new office will serve as a dynamic base for Hubexo's teams across its UKI products, including Glenigan and NBS, as well as global Hubexo colleagues. The centrally located space ...
20/12/2024
Six social housing residents in Exeter have become the first in the UK to move into homes with no energy bills for at least five years, thanks to Octopus Energy's 'Zero Bills' initiative. The homes, located in the Nexa Fields development, are powered by cutting-edge green technology, including ...
20/12/2024
South Cambridgeshire District Council has granted planning permission for up to 4,500 new homes at Waterbeach, marking a major step in the development of the area into a new town. The outline permission, issued to RLW Estates, includes plans for housing as well as business, retail, community, ...
20/12/2024
A joint venture between Siemens Mobility and Costain is set to be awarded a major contract to deliver high-voltage (HV) power supply systems for HS2, the high-speed rail project connecting London to the West Midlands. The contract covers the entire 225km route and represents a significant ...
19/12/2024
Norwich City Council has approved plans to install over 600 solar panels on the roof of Riverside Leisure Centre, marking a significant step towards reducing the building's energy costs and carbon footprint. Set to be installed in early 2024, the solar panels are expected to cut the leisure ...
19/12/2024
The latest images of the transformational Stockton Waterfront urban park have been revealed, marking one year since work began on the project. Led by Esh Construction and commissioned by Stockton-on-Tees Borough Council, the development is a cornerstone of the Council’s 25-year vision to reshape ...
19/12/2024
Caddick has reached a major milestone in the construction of Ark 42, a 42,594 sq ft speculative industrial and logistics development at Trafford Park Road, with the steel frame structure now complete. Commissioned by Trebor Developments on behalf of The Prudential Assurance Company and M&G Real ...
19/12/2024
Skanska has reached a major milestone on the M42 Junction 6 scheme near Birmingham, opening the A4545 link road and the new motorway junction 5a to traffic for the first time on Wednesday, December 18. The new 2.4km dual carriageway, part of a three-year project for National Highways, aims to ...