Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
21/11/2023

Costain Completes Refurb Work At Gatwick Airport Station

Construction News Image
Costain has completed works to ensure today's entry into service of the upgraded Gatwick Airport station.

The four-and-a-half-year construction and refurbishment project began in June 2019 and significantly upgrades the station's ability to handle growing passenger numbers.

Costain first delivered the planning and design stages and was then appointed to deliver the improvement works. The project has created a safer, more convenient interchange between the station platforms and Gatwick International Airport. The brief included the construction of a new concourse and staff accommodation, as well as carrying out the reconfiguration of railway infrastructure. Costain has also refurbished the existing station concourse and footbridges, enhancing the one-way system between the airport and the station. There are new customer information systems, more ticket gates and significant improvements to accessibility with the installation of eight new escalators and five new lifts.

Costain's project director, Andy Hudspith, said: "We're really proud of the work we've undertaken for Network Rail to upgrade the station at Gatwick Airport. The project has been complex and challenging, but we’re pleased that our work will enhance the passenger experience and improve journey times for everyone who uses and passes through the airport. The biggest challenge was to achieve the transformation without negatively impacting rail or airport operations, and with minimal impact on passengers, all while working above a live railway line and within the heart of the world’s busiest single runway airport. We’re delighted to have delivered such an important project successfully."

-- Advertisement --
hss

The new second concourse has been built above the existing platforms five, six and seven, doubling the space available for passengers at the station. The new exit concourse measures 1727 square metres, the size of eight tennis courts and provides a spectacular new entrance space to the airport. The roof of the new concourse is formed using four clear spanning steel trusses that connect the platform and concourse environments in a sweeping arch form. The trusses are finished in gold anodised aluminium cladding, bringing warmth and prestige to the space. In between the trusses there are 945 square metres of ETFE pillows (a lightweight alternative to glazing) which floods the concourse with natural light, using the same technology as the biospheres at the Eden Project in Cornwall.

Accessibility has been improved throughout, for example wheelchairs users’ access has been improved through the widening of the historically narrow platforms five and six. New tactile signage, including braille, has been integrated into the wayfinding signage strategy and there are 70 new hearing loops at key points. A 24/7 special assistance point has been created in the existing station concourse to provide additional support for passengers with reduced mobility and disabilities.

As well as encouraging sustainable travel, Costain also targeted reducing carbon emissions during the building and operation of the new concourse. The project used almost 3,000m3 of low-carbon concrete, saving 517 tonnes of CO2 emissions and £12,500 in costs. LED lighting was used throughout the station, escalators were fitted with reduced speed technology to lower emissions when not in use, and high efficiency gearless lifts were installed as well as a hybrid heating and cooling system. An estimated annual cost saving of nearly £60,000 and an annual reduction of 144 tonnes of carbon emissions are expected from these features.

Latest Construction News

21/11/2024

Stepnell has opened its new office in Liverpool, marking a significant step in the company's expansion into the North West. Building on its extensive experience delivering projects across the East and West Midlands as well as South of England, Stepnell is well positioned to serve a broader range ...
21/11/2024

Kier has announced a partnership with Sunbelt Rentals, naming the company as its official supplier of Hydrotreated Vegetable Oil (HVO) fuel. The move marks a significant step in Kier's efforts to reduce its carbon footprint and enhance sustainability across its operations. Over the next year, ...
21/11/2024

Esh Construction has been appointed to lead the next stage of one of the UK's most ambitious urban regeneration initiatives, Riverside Sunderland. In collaboration with Sunderland City Council, the company will deliver a £5.7 million package of infrastructure upgrades to drive forward this ...
21/11/2024

Europe's leading online cleanroom consumables supplier, Cleanroomshop, has recently launched a brand-new website, giving its users an improved user experience. The new website continues to offer over 2,000 products from more than 40 brands, whilst incorporating a new look and more efficient ...
21/11/2024

At Ecomerchant, we offer a carefully curated selection of sustainable weatherproofing solutions, including natural lime renders, mineral finishes, and vapour-open waterproofing materials. They help prevent structural damage while ensuring your building can breathe naturally. Our eco-friendly ...
20/11/2024

Construction firm Willmott Dixon has partnered with Westminster City Council on a £36 million project to restore the historic Seymour Centre in Marylebone, a Grade II listed building dating back to the 1930s. The project, procured through the SCF framework, will see the three-storey centre undergo ...
20/11/2024

The Hill Group has commenced work on a new development in Billericay, Essex, which will deliver 179 high-quality homes across a 20-acre site. Designed to blend with Billericay's scenic countryside while addressing the pressing demand for sustainable housing, the project is located on Kennel Lane ...
20/11/2024

Extensive groundwork is underway for a new housing development in Maidstone, where Vistry Group, in partnership with Legal & General Affordable Homes, is set to build 272 properties on the site of the former Tovil Quarry off Farleigh Hill. The project will include 37 affordable homes for low-cost ...
20/11/2024

Stonewater has scooped a new energy efficiency retrofit contract with compliance and energy services provider Correct Contract Services. This work, funded through the Social Housing Decarbonisation Fund (SHDF) Wave 2, will include a range of energy-saving upgrades. Measures such as loft ...
20/11/2024

Kier has been appointed by Cambridgeshire County Council to deliver building, mechanical, and electrical maintenance services across the Council's portfolio of 160 corporate buildings. The contract, which began in November 2024, will run until 2027, with the possibility of two one-year extensions ...
Lakeside HireThink Construction Skills Ltd.BRICOFLOR UKEfco UK LtdT & D Glazing And Installation LimitedStuart CanvasAqua Direct Ltd(London) Builder Cambridge LtdElectrical Test Midlands LtdEH Smith Builders Merchants
Terms and Conditions
2024/11/21 15:47:14