Subscribe to our Construction Newsfeed
Uk Construction Directory
Search our 156,810 companies....

Construction News

21/11/2023

Construction Begins On Benson Relief Road Scheme

Construction News Image
Oxfordshire County Council has commenced construction on the south westerly section of the Benson relief road scheme, with the creation of flood protection measures.

The Benson relief road will be an alternative route from the A4074 and B4009, north of Benson.

The relief road will reduce congestion through Benson village and give the new housing developments to the north direct access to the A4074, at the Elms Bridge roundabout, and the B4009, west of Braze Lane. The project will also provide capacity improvements at the A4074 Church Road junction.

Councillor Judy Roberts, Oxfordshire County Council's Cabinet Member for Infrastructure and Development Strategy, said: "Benson is a commuter village, with many working people travelling to their jobs. Benson’s village centre has a complex arrangement of junctions, which must be navigated by both local and through traffic – including children walking to school and to other village facilities.
-- Advertisement --
hss



"Pedestrians, particularly those less mobile and parents with young children and pushchairs, are at risk while crossing the roads. The Benson relief road is a central piece to new infrastructure for the village and a vital tool to reducing through traffic. It incorporates measures to encourage cycling and walking locally, which helps reduce car usage in the village, lessening congestion, local emissions and adverse air quality."

The county council has appointed Milestone Infrastructure to complete its 250 metre section of the road as well as prepare a flood compensation area. The new road is within a flood zone and the flood compensation area is a large area of ground, lowered and offset from the road, which will provide a storage facility for any flood water.

Work on the flood compensation area will take approximately 12 weeks, subject to weather conditions. Also included as part of the work will be an archaeology ‘trace, dig and mapping’ exercise to identify and record any archaeological finds in the construction area.

Once the flood protection measures are complete, full construction of the highway, including laying tarmac and sidewalks, landscaping and lighting as well as the cycle and pedestrian paths, will begin in early 2024, lasting six to eight months.

Planning consent for the scheme was granted in January 2022 and it is being funded through a combination of Growth Deal funding and Section 106 contributions from developers.

Latest Construction News

17/01/2025
Leeds Trinity University has officially opened its newly refurbished City Campus at 1 Trevelyan Square in Leeds. Completed by GRAHAM Interior Fit-Out, the transformation of the central Leeds site introduces state-of-the-art facilities designed to improve learning and collaborate with industry partn
17/01/2025
Trammell Crow Company (TCC) has secured planning permission for a Grade A logistics scheme in Heywood, Greater Manchester, following a successful planning appeal. The development will feature two state-of-the-art industrial and logistics buildings. One building will house two units measuring 4,796
17/01/2025
Poole-based developer AJC Group has celebrated a record-breaking 2024, delivering 100 affordable homes, a significant increase from the 72 units completed in the previous year. Since 2023, AJC Group has completed and handed over 172 affordable homes across five sites. In 2024 alone, the developer
17/01/2025
Plans for one of the most ambitious parks projects in London have taken a significant step forward, with Haringey Council securing nearly two additional acres of land around The Paddock nature reserve in Tottenham Hale. The agreement with Thames Water marks a major milestone in the transformation o
17/01/2025
Islington Council has unveiled two draft guidance documents aimed at helping residents, businesses, and developers combat climate change by making buildings more energy efficient and fostering a greener, healthier borough. The consultation seeks feedback on the draft Climate Action Supplementary Pl
17/01/2025
The City of Wolverhampton Council has unveiled a £98 million investment plan over the next five years to develop around 500 new homes across the city. The proposal, part of the Housing Revenue Account (HRA) Business Plan, received Cabinet approval this week and now moves to Full Council for final
17/01/2025
Croydon Council has announced a significant milestone in the redevelopment of the Purley Pool site, with revised proposals submitted for a new leisure centre, later living housing, and the regeneration of the surrounding area. A planning application for the site was initially submitted in 2024, pro
17/01/2025
The City of Wolverhampton Council has announced that demolition work has commenced on the New Park Village estate, marking the start of a major £40 million redevelopment project to transform outdated council housing. Contractor DSM Demolition has begun pulling down poor-quality bungalows on Valley
17/01/2025
Hillingdon Council has acquired 12 new homes at Carpenters Court in Uxbridge. Leader of Hillingdon Council, Cllr Ian Edwards and Cllr Steve Tuckwell, Cabinet Member for Planning, Housing and Growth, visited the site to officially mark the handover of the properties from local developer Kearns Devel
17/01/2025
Organisers of UK Construction Week (UKCW) have announced another major coup for the show's 10th anniversary year, with the news that UKCW London will be co-locating with the 14th edition of The Stone Show & Hard Surfaces, the principal industry event for surface design. Established 26 years ago, th
Aqua Direct LtdBRICOFLOR UKThink Construction Skills Ltd.Stuart CanvasT & D Glazing And Installation LimitedLakeside HireEfco UK Ltd123v PlcForge Lifts LtdLandscaping Cambridge