Construction News
15/12/2023
Further Upgrade Work To Start On East Coast Digital Programme
Further upgrade work for the billion-pound East Coast Digital Programme (ECDP) is to take place on Christmas Eve.
The project will see traditional, lineside signals replaced with signalling displayed inside drivers' cabs, which will lead to more reliable journeys for passengers and a greener railway.
On Christmas Eve, work will continue to focus on the stretch between Welwyn Garden City and Hitchin and will see further installation and testing of key equipment in preparation for trains to operate using digital signalling in this area from 2025.
The work means that there will be changes to train services, with no LNER, Lumo, or Hull Trains services terminating at or departing from London King’s Cross station. Grand Central will be operating no services.
LNER will be operating a reduced service starting and terminating at St Neots or Peterborough. Rail replacement coaches will run between St Neots and Bedford, where customers can join EMR or Thameslink services to London St Pancras. LNER services will also finish earlier than usual ahead of the Christmas holiday.
Hull Trains will be running a reduced train service of one train in each direction which will divert and terminate in London St Pancras. Lumo services will only operate between Edinburgh and Newcastle.
Passengers are urged to check their journey before travelling via National Rail Enquiries or their train operator.
Sarah Hewlett, Network Rail’s Programme Manager for East Coast Digital Programme, said: "The East Coast Digital Programme will transform the way trains operate on the East Coast Main Line and will result in a more reliable, resilient, and greener railway for our passengers.
"We want to thank passengers for their patience and understanding ahead of this vital work, especially as people travel ahead of Christmas, and appreciate that their journeys will take longer than normal.
"We're reminding passengers to check their journey before they travel via National Rail Enquiries or through their train operator."
The project will see traditional, lineside signals replaced with signalling displayed inside drivers' cabs, which will lead to more reliable journeys for passengers and a greener railway.
On Christmas Eve, work will continue to focus on the stretch between Welwyn Garden City and Hitchin and will see further installation and testing of key equipment in preparation for trains to operate using digital signalling in this area from 2025.
The work means that there will be changes to train services, with no LNER, Lumo, or Hull Trains services terminating at or departing from London King’s Cross station. Grand Central will be operating no services.
LNER will be operating a reduced service starting and terminating at St Neots or Peterborough. Rail replacement coaches will run between St Neots and Bedford, where customers can join EMR or Thameslink services to London St Pancras. LNER services will also finish earlier than usual ahead of the Christmas holiday.
Hull Trains will be running a reduced train service of one train in each direction which will divert and terminate in London St Pancras. Lumo services will only operate between Edinburgh and Newcastle.
Passengers are urged to check their journey before travelling via National Rail Enquiries or their train operator.
Sarah Hewlett, Network Rail’s Programme Manager for East Coast Digital Programme, said: "The East Coast Digital Programme will transform the way trains operate on the East Coast Main Line and will result in a more reliable, resilient, and greener railway for our passengers.
"We want to thank passengers for their patience and understanding ahead of this vital work, especially as people travel ahead of Christmas, and appreciate that their journeys will take longer than normal.
"We're reminding passengers to check their journey before they travel via National Rail Enquiries or through their train operator."
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a