Construction News
19/12/2023
Unite Students Secures New Bristol Development
The UK's largest provider of student accommodation, Unite Students is set to build a new 600-bed development at the heart of Bristol's biggest ever regeneration project.
Marsh Mills, which has a total development cost of £75million, is to be constructed adjacent to the University of Bristol's new Temple Quarter campus, close to the city's Temple Meads train station. A lease agreement is in place with the Russell Group university for at least half of the rooms.
The property has planning permission for 596 beds and will open in time for the 2025/26 academic year.
The building's operational energy consumption has been reduced through a 'fabric first' approach. Energy efficiency has been considered during design and build phase through to the manufacturing of materials and their transportation to the site, as well as their installation and use throughout the operational lifecycle of the building. Air source heat pumps and solar panels will also be installed.
Unite Students' Marsh Mills property in Bristol
The development's embodied carbon saving is 7,300 tCO2e (tonnes of carbon dioxide equivalent) over the lifecycle of the building, which exceeds the RIBA (Royal Institute of British Architects) 2030 Climate Challenge baseline. These are voluntary performance targets for operational energy use, water use and embodied carbon.
The development site is in the heart of the Bristol Temple Quarter Enterprise Zone and St Philip's Marsh, one of the UK's largest regeneration projects. The property will also include communal features including study spaces, a roof terrace, a gym and cycle storage.
Tom Brewerton, Group Development Director at Unite Students, said:
"Bristol is where it all began for Unite Students and this new property is in a vitally important scheme for students in the city. Marsh Mills will be built alongside the University of Bristol's new Temple Quarter campus, providing close proximity to the campus, plus the city's Temple Meads train station.
"This development is further evidence of Unite Students' commitment to delivering new supply of high-quality student accommodation in cities where it is needed most. Marsh Mills will have a low-carbon impact on the environment and will be built and open in time for the start of 2025/6 academic year, adding to our portfolio in the city and contributing to the much-needed regeneration of the Temple Quarter and St Philip's Marsh area of the city."
RG Group has been awarded the build contract and construction work is now underway.
Marsh Mills, which has a total development cost of £75million, is to be constructed adjacent to the University of Bristol's new Temple Quarter campus, close to the city's Temple Meads train station. A lease agreement is in place with the Russell Group university for at least half of the rooms.
The property has planning permission for 596 beds and will open in time for the 2025/26 academic year.
The building's operational energy consumption has been reduced through a 'fabric first' approach. Energy efficiency has been considered during design and build phase through to the manufacturing of materials and their transportation to the site, as well as their installation and use throughout the operational lifecycle of the building. Air source heat pumps and solar panels will also be installed.
Unite Students' Marsh Mills property in Bristol
The development's embodied carbon saving is 7,300 tCO2e (tonnes of carbon dioxide equivalent) over the lifecycle of the building, which exceeds the RIBA (Royal Institute of British Architects) 2030 Climate Challenge baseline. These are voluntary performance targets for operational energy use, water use and embodied carbon.
The development site is in the heart of the Bristol Temple Quarter Enterprise Zone and St Philip's Marsh, one of the UK's largest regeneration projects. The property will also include communal features including study spaces, a roof terrace, a gym and cycle storage.
Tom Brewerton, Group Development Director at Unite Students, said:
"Bristol is where it all began for Unite Students and this new property is in a vitally important scheme for students in the city. Marsh Mills will be built alongside the University of Bristol's new Temple Quarter campus, providing close proximity to the campus, plus the city's Temple Meads train station.
"This development is further evidence of Unite Students' commitment to delivering new supply of high-quality student accommodation in cities where it is needed most. Marsh Mills will have a low-carbon impact on the environment and will be built and open in time for the start of 2025/6 academic year, adding to our portfolio in the city and contributing to the much-needed regeneration of the Temple Quarter and St Philip's Marsh area of the city."
RG Group has been awarded the build contract and construction work is now underway.
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i