Bidwells has secured planning permission on behalf of developer Pioneer Group for the regeneration of the Grafton Centre in Cambridge.
Upon completion, the scheme will see the transformation of the in-decline retail centre into a new, sustainable mixed-use destination featuring retail, lab, and event space.
The regeneration is expected to deliver several public benefits including the provision of approx. 2,652 jobs (1,944 skilled, 707 unskilled), a highly sustainable environment with retrofitting of existing building infrastructure to implement better water and energy efficiency, a hotel and leisure centre, and a cycling lane/footpath and car park. The regeneration will also see the creation of a new public square with trees, seating, and improved public space.
An enhanced shopping environment will be created at the west end of the centre, by the Burleigh and Fitzroy streets. The life sciences focused space will occupy the central and eastern area of the existing the Grafton Centre, and will encompass around 47,321 sqm gross internal area of floor space across five floors with a basement level below and a rooftop plant area above. The layout will also consist of a mix of lab and write up spaces. The retail area will entail 10,500 sqm GIA of space, while at the eastern edge of the site adjacent to East Road a new hotel and leisure centre will occupy around 6,200 sqm of GIA collectively.
Jonathan Bainbridge, Partner, Planning at Bidwells, said: "We are very pleased to have played a part in facilitating a scheme that will offer significant public realm improvements while tapping into the strong demand for life sciences workspace in Cambridge. The Grafton Centre is a site of vast, as-of-yet unfulfilled potential, and this holistic regeneration project will see it transformed into a thriving commercial and retail hub. It has been a pleasure to work with Pioneer Group and the Cambridge City Council Planning Committee in getting this over the line."
Construction News
09/02/2024
Plans Approved To Regenerate The Grafton Centre In Cambridge


19/06/2025
Winvic Construction Ltd has completed its first venture into the Life Sciences sector with the delivery of Phase 2 of Bourn Quarter, a premier Research and Development hub situated near Cambourne, west of Cambridge.
The project was undertaken for developer Mortimer/RE (formerly Aitchison Developmen

19/06/2025
South Shields town centre is undergoing a major transformation as work begins on a £95 million regeneration project to relocate South Tyneside College and the South Shields Marine School to a new, purpose-built campus in the heart of the town.
Construction is now underway on the 15,000 sqm educatio

19/06/2025
The Ash Barge Dock at Northumberland Energy Park (NEP) has undergone a major transformation following the completion of complex infrastructure works by Esh Construction in partnership with Advance Northumberland.
Located near the Port of Blyth, NEP is a key part of Energy Central—the UK’s strategic

19/06/2025
Clarion Partners Europe has acquired Frontier Park Blackburn for £115 million, on behalf of its managed funds.
The deal sees the modern logistics park purchased from developer Monte Blackburn Limited.
Located just two miles east of Blackburn city centre and adjacent to Junction 6 of the M65 motor

19/06/2025
PlanRadar, a leading digital platform for documentation, communication, and reporting in construction and real estate, has announced a major new partnership with Erith Group, one of the UK's top specialist contractors.
Following a thorough evaluation process, Erith Group has chosen PlanRadar as its

19/06/2025
Rail passengers travelling between Swindon and Bristol Parkway are being advised to plan their journeys in advance as Network Rail prepares to carry out critical flood resilience works in July.
From Monday 7 July to Sunday 13 July, engineers will work around the clock in and around Chipping Sodbury

19/06/2025
Kier has completed the refurbishment of a new NHS Blood and Transplant (NHSBT) facility in Eastleigh, transforming office space at Concept House into a state-of-the-art blood donation centre aimed at boosting local donations and supporting critical NHS needs.
Delivered in just 14 weeks, the project

19/06/2025
Severn Trent has officially started work on a major infrastructure upgrade in Hampton Magna, marking the beginning of a £2 million investment aimed at improving the village's water network.
The project involves replacing ageing water pipes to provide a more reliable and resilient supply for the loc

19/06/2025
Stepnell has completed the main structural phase of the £11.3 million leisure centre at Stychbrook Park in Lichfield.
The occasion was celebrated with a traditional 'topping out' ceremony, attended by Double Olympic gold medallist Rebecca Adlington OBE. The facility, which will replace the ageing F

19/06/2025
Halifax Civic Trust has recently announced a new President at its Annual General Meeting.
Jeremy Hall, Chairman and Managing Director at one of the town’s most prized heritage sites, Dean Clough, assumes the important role that was previously held by his late father, Sir Ernest Hall OBE.
Halifax