Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,820 companies....

Construction News

29/02/2024

Bulk Tankered Water For Construction

Construction News Image
For many businesses, getting water from drinking water tanker suppliers is becoming the preferred option.

Whether you are looking to fill up a large office building or just need a few containers of drinking water for a smaller business, getting it from reputable water tanker suppliers can be the most cost-effective and efficient way to go about it.

Aqua Direct deliver on a just in time basis making sure your water arrives with you just when you need it.

We will provide delivery, full site installation and management of your water requirements.

We can regularly fill either on a long term or an ad-hoc one off basis.

We can leave our tankers and bowsers on site, enabling you to use the water at your convenience. We can drop and swap the tankers and refill the bowsers to suit your needs
-- Advertisement --
hss



24/7 contact with Aqua Direct Operations Manager in case of any changes or issues that may arise.

If your water supply is not yet installed or usable or too slow to keep your project timings on track, call Aqua Direct and we can deliver clean fresh water to your site.

Aqua Direct use a dynamic pricing structure which ensures we will provide you with a competitive price.

BULK TANKERED WATER FOR CONSTRUCTION

QUALITY ASSURED

Don't take risks – know the history/background analysis of your spring water.

We run rigorous quality assurance systems and an HACCP accountability plan to ensure our product reaches you in pristine condition. Aqua Direct hold a BRC ‘A’ accreditation Certificate and are regularly audited internally and externally.

Every tanker carries a certificate of sterility for the 29,500 litres of water. Two samples are taken for every load and sent to an UKAS Accredited Laboratory for testing.

Every load is fitted with tamper evident seals for each customer to remove on arrival to their site.

Aqua Direct's tankers can offload 29,500 litres of water within 30 minutes of arrival at your site with our integral pumps.

All our spring water tankers are bespoke and built specifically to ensure the best conditions for carrying our product to your facility using food grade 316 stainless steel for our tanker barrels.

Latest Construction News

05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre. The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area. The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic. The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre. The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment. The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes. The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road. The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall. Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs. The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund. The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a
Think Construction Skills Ltd.Stuart CanvasT & D Glazing And Installation LimitedAqua Direct LtdBRICOFLOR UKEfco UK LtdLakeside HireThe Lorry Loader Checking AppVictory Windows International LtdMacs Truck Sales