Construction News
05/03/2024
Construction Work On £5.8m Facility In London Complete
Construction work has been completed on a new £5.8 million Gene Therapy Vector Facility (GTVF) at King's College in London.
The expanded facility was delivered within a live environment and will now operate as one of the largest suppliers of Good Manufacturing Practices (GMP) grade viral vectors, supporting clinical trials across Europe. It boasts a new micro laboratory, which will be used for routine environmental monitoring activities and assessment of incoming microbiological media.
Meanwhile, two laboratories on the second floor of the Rayne Institute were fully stripped and fitted out to create two Grade C clean rooms, to support suites that manufacture viral vectors. The project also included the consolidation of existing storage areas into one functioning suite, with a refurbishment changing area extended to accommodate the facility’s enhanced service capabilities. To achieve Grade C status, the installation of a new air handling unit to support filtration and humidity in the medical environments was necessary.
Multi-disciplinary property, infrastructure and construction consultancy Pick Everard has been responsible for managing and designing the project, providing mechanical, building, electrical, structural engineering and project management services.
John Clarke, director at Pick Everard said: "This was a highly technical operation given the project’s nature and eventual end use. In turn, this presented a range of unique challenges for our design teams, which were carefully navigated through effective stakeholder engagement and ensuring close compliance with Medicines and Healthcare products Regulatory Agency (MHRA) and GMP regulations.
"Our work needed to ensure that it would not interfere with a live working environment and the crucial work ongoing within the existing Rayne Institute. As well as undertaking weekly risk assessments, a rigorous preparation process was implemented to ensure no contaminants entered scientific and medical areas.
"This has been a truly unique project and we’re incredibly proud to deliver a project that will play a huge role in clinical discovery."
Ensuring efficiency and sustainability were central pillars to the design, the new facility is targeting a BREEAM ‘very good’ rating and was compliant through RIBA design Stages 1-6.
The project, which operated across a 140 square metre space, was supported through funding from King's College London and the EU’s European Regional Development Fund (ERDF).
The expanded facility was delivered within a live environment and will now operate as one of the largest suppliers of Good Manufacturing Practices (GMP) grade viral vectors, supporting clinical trials across Europe. It boasts a new micro laboratory, which will be used for routine environmental monitoring activities and assessment of incoming microbiological media.
Meanwhile, two laboratories on the second floor of the Rayne Institute were fully stripped and fitted out to create two Grade C clean rooms, to support suites that manufacture viral vectors. The project also included the consolidation of existing storage areas into one functioning suite, with a refurbishment changing area extended to accommodate the facility’s enhanced service capabilities. To achieve Grade C status, the installation of a new air handling unit to support filtration and humidity in the medical environments was necessary.
Multi-disciplinary property, infrastructure and construction consultancy Pick Everard has been responsible for managing and designing the project, providing mechanical, building, electrical, structural engineering and project management services.
John Clarke, director at Pick Everard said: "This was a highly technical operation given the project’s nature and eventual end use. In turn, this presented a range of unique challenges for our design teams, which were carefully navigated through effective stakeholder engagement and ensuring close compliance with Medicines and Healthcare products Regulatory Agency (MHRA) and GMP regulations.
"Our work needed to ensure that it would not interfere with a live working environment and the crucial work ongoing within the existing Rayne Institute. As well as undertaking weekly risk assessments, a rigorous preparation process was implemented to ensure no contaminants entered scientific and medical areas.
"This has been a truly unique project and we’re incredibly proud to deliver a project that will play a huge role in clinical discovery."
Ensuring efficiency and sustainability were central pillars to the design, the new facility is targeting a BREEAM ‘very good’ rating and was compliant through RIBA design Stages 1-6.
The project, which operated across a 140 square metre space, was supported through funding from King's College London and the EU’s European Regional Development Fund (ERDF).
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i