Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
28/05/2024

New Aggregate Manufacturing Plant Opens In Wellingborough

Construction News Image
The UK's newest aggregate manufacturing plant has been officially opened in Wellingborough, providing low-carbon secondary aggregate to help meet the Midlands' construction needs.

The plant will transform around 200,000 tonnes per year of incinerator bottom ash (IBA) left over from the energy-from-waste (EfW) process into EcoBlend, a sustainable manufactured aggregate for use in the built environment.

The £20 million facility was formally opened by Gen Kitchen, MP for Wellingborough, at a launch event organised by the plant’s joint owners – energy-from-waste business Encyclis and material specialists Day Aggregates – supported by aggregates trading firm GRS, the contracted distributor for the local area.

At the official opening ceremony, the plant was described as a symbol of regeneration, representing significant inward investment into the region. In addition to the 50 contractors per day that were supported during 17-months of construction and commissioning, the plant has directly created an additional nine full-time jobs on-site and will further support the local supply chain.

-- Advertisement --
hss

Gen Kitchen, MP for Wellingborough, said: "I'm delighted to formally open this facility, which represents a significant investment into our region. I’m passionate about the potential of this area as a hub for business, due to its central location, transport links and strong industrial track record. It’s also important that we ensure commercial activity is sustainable and this aggregate manufacturing facility is an excellent example of that, taking a residual material that would previously have been discarded and turning it into a useful material that supports local construction. It’s vital that we promote a more circular economy in this way."

A strategic partnership between Encyclis and Day Aggregates was established to begin building the plant 18-months ago on a site in the Finedon Road Industrial Estate. The plant’s location offers optimal transport links, while addressing an identified deficit in the local availability of natural resources. This new supply chain for EcoBlend will service local needs with a product that is sustainable, cost-effective and certified to the required specifications.

The project bolsters the circular economy by recycling a by-product of the energy-from-waste process. Encyclis’s energy recovery facilities – Rookery South, in Bedfordshire, and Newhurst, in Leicestershire – provide capacity to annually treat over one million tonnes of residual waste that would previously have been sent to landfill. The waste is combusted at high temperatures to produce baseload electricity, heat and other resources.

After the combustion process, inert ash is left over. This is transported from the two energy recovery facilities to the Wellingborough plant. Day Aggregates extracts any remaining metals for recycling and converts the bottom ash into aggregate products including EcoBlend, which serves as an effective sub-base under pavements, footpaths, car parks and roads.

Materials trading firm GRS is responsible for marketing the products to construction companies looking for cost-effective materials that also enhance the environmental credentials of their projects.

Latest Construction News

21/11/2024

Stepnell has opened its new office in Liverpool, marking a significant step in the company's expansion into the North West. Building on its extensive experience delivering projects across the East and West Midlands as well as South of England, Stepnell is well positioned to serve a broader range ...
21/11/2024

Kier has announced a partnership with Sunbelt Rentals, naming the company as its official supplier of Hydrotreated Vegetable Oil (HVO) fuel. The move marks a significant step in Kier's efforts to reduce its carbon footprint and enhance sustainability across its operations. Over the next year, ...
21/11/2024

Esh Construction has been appointed to lead the next stage of one of the UK's most ambitious urban regeneration initiatives, Riverside Sunderland. In collaboration with Sunderland City Council, the company will deliver a £5.7 million package of infrastructure upgrades to drive forward this ...
21/11/2024

Europe's leading online cleanroom consumables supplier, Cleanroomshop, has recently launched a brand-new website, giving its users an improved user experience. The new website continues to offer over 2,000 products from more than 40 brands, whilst incorporating a new look and more efficient ...
21/11/2024

At Ecomerchant, we offer a carefully curated selection of sustainable weatherproofing solutions, including natural lime renders, mineral finishes, and vapour-open waterproofing materials. They help prevent structural damage while ensuring your building can breathe naturally. Our eco-friendly ...
20/11/2024

Construction firm Willmott Dixon has partnered with Westminster City Council on a £36 million project to restore the historic Seymour Centre in Marylebone, a Grade II listed building dating back to the 1930s. The project, procured through the SCF framework, will see the three-storey centre undergo ...
20/11/2024

The Hill Group has commenced work on a new development in Billericay, Essex, which will deliver 179 high-quality homes across a 20-acre site. Designed to blend with Billericay's scenic countryside while addressing the pressing demand for sustainable housing, the project is located on Kennel Lane ...
20/11/2024

Extensive groundwork is underway for a new housing development in Maidstone, where Vistry Group, in partnership with Legal & General Affordable Homes, is set to build 272 properties on the site of the former Tovil Quarry off Farleigh Hill. The project will include 37 affordable homes for low-cost ...
20/11/2024

Stonewater has scooped a new energy efficiency retrofit contract with compliance and energy services provider Correct Contract Services. This work, funded through the Social Housing Decarbonisation Fund (SHDF) Wave 2, will include a range of energy-saving upgrades. Measures such as loft ...
20/11/2024

Kier has been appointed by Cambridgeshire County Council to deliver building, mechanical, and electrical maintenance services across the Council's portfolio of 160 corporate buildings. The contract, which began in November 2024, will run until 2027, with the possibility of two one-year extensions ...
Think Construction Skills Ltd.BRICOFLOR UKAqua Direct LtdEfco UK LtdStuart CanvasLakeside HireT & D Glazing And Installation LimitedCastle Scaffolding Northern LtdAC Cable SolutionsAremco Barriers
Terms and Conditions
2024/11/21 14:24:49