Construction News
17/06/2024
Guardtech Protecting Life Sciences Firms With Elite Furniture & Equipment Range
Suffolk cleanroom construction experts focused on helping businesses raise standards with high-quality facility fit-outs.
THE GUARDTECH GROUP are more than just a cleanroom construction company – they’re a business that help to solve problems.
One of the biggest problems that their clients often face, in fields such as Life Sciences, High-Tech Engineering and Healthcare, is having the appropriate kit to conduct their process effectively and efficiently.
The Suffolk-based controlled environment construction experts have been building elite-level cleanrooms for leading firms across a wide range of industries for 25 years now, from Aerospace to Pharmaceuticals, Medical Device to Semiconductor and Micro-electronics, Optical manufacturing to Cell & Gene Therapy.
And in those 25 years, one thing hasn't changed – great businesses need great equipment to thrive.
"It's a big part of our holistic package," said Jack Pummell, Guardtech Business Development Manager (BDM) for the South of England. "Pretty much every single one of our turnkey clients, and many of our smaller modular and CleanCube Mobile Cleanroom customers, need more than just a construction partner. They need the full package.
"That's Cleanroom Service Plans, that’s dedicated Decontamination programmes, but it’s also full furniture & equipment fit-outs.
"If a client is going to the hassle, and expense, of putting together an impressive new facility, they also want to ensure they've got the best possible kit in those process rooms to help them achieve their goals. And we’re on hand to help them get there."
Pummell, alongside Northern territory BDM Steve Bawa, helps provide clients with a range of high-performance stainless-steel furniture – including stepover benches, shelving, garment stockers, dispensers, workbenches, cabinets, sinks, taps, bins, lockers and trolleys.
But the scope of Guardtech's cleanroom fit-outs goes far beyond quality stainless stock – with everything from cleanroom-grade ergonomic chairs and Dyson Airblade hand dryers to Trespa furniture and pass-through hatches covered.
And that's before you get to the range of separative devices the Group offer, with biosafety cabinets, laminar flow units, wet benches, ducted and ductless fume hoods and isolators all part of potential packages.
"There really isn't anything we don’t cover," added Bawa, "at least in terms of cleanroom-specific furniture and equipment. We’ve got branded Guardtech Group autoclaves and nitrogen generators, particle counters, air showers – whatever you need, Jack and I are here to take away the hassle of kitting out your cleanroom.
"I'd urge any business out there, operating within a controlled environment, that need to upgrade, replace or just refresh their furniture and equipment, to get in touch immediately. We look forward to helping you find the solutions you need to any issues you may have."
For more information on the Guardtech Group’s furniture & equipment solutions, email sales@guardtech.com, visit www.guardtechgroup.com or call 0330 113 0303.
Image: Guardtech Group
THE GUARDTECH GROUP are more than just a cleanroom construction company – they’re a business that help to solve problems.
One of the biggest problems that their clients often face, in fields such as Life Sciences, High-Tech Engineering and Healthcare, is having the appropriate kit to conduct their process effectively and efficiently.
The Suffolk-based controlled environment construction experts have been building elite-level cleanrooms for leading firms across a wide range of industries for 25 years now, from Aerospace to Pharmaceuticals, Medical Device to Semiconductor and Micro-electronics, Optical manufacturing to Cell & Gene Therapy.
And in those 25 years, one thing hasn't changed – great businesses need great equipment to thrive.
"It's a big part of our holistic package," said Jack Pummell, Guardtech Business Development Manager (BDM) for the South of England. "Pretty much every single one of our turnkey clients, and many of our smaller modular and CleanCube Mobile Cleanroom customers, need more than just a construction partner. They need the full package.
"That's Cleanroom Service Plans, that’s dedicated Decontamination programmes, but it’s also full furniture & equipment fit-outs.
"If a client is going to the hassle, and expense, of putting together an impressive new facility, they also want to ensure they've got the best possible kit in those process rooms to help them achieve their goals. And we’re on hand to help them get there."
Pummell, alongside Northern territory BDM Steve Bawa, helps provide clients with a range of high-performance stainless-steel furniture – including stepover benches, shelving, garment stockers, dispensers, workbenches, cabinets, sinks, taps, bins, lockers and trolleys.
But the scope of Guardtech's cleanroom fit-outs goes far beyond quality stainless stock – with everything from cleanroom-grade ergonomic chairs and Dyson Airblade hand dryers to Trespa furniture and pass-through hatches covered.
And that's before you get to the range of separative devices the Group offer, with biosafety cabinets, laminar flow units, wet benches, ducted and ductless fume hoods and isolators all part of potential packages.
"There really isn't anything we don’t cover," added Bawa, "at least in terms of cleanroom-specific furniture and equipment. We’ve got branded Guardtech Group autoclaves and nitrogen generators, particle counters, air showers – whatever you need, Jack and I are here to take away the hassle of kitting out your cleanroom.
"I'd urge any business out there, operating within a controlled environment, that need to upgrade, replace or just refresh their furniture and equipment, to get in touch immediately. We look forward to helping you find the solutions you need to any issues you may have."
For more information on the Guardtech Group’s furniture & equipment solutions, email sales@guardtech.com, visit www.guardtechgroup.com or call 0330 113 0303.
Image: Guardtech Group
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i