Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
24/07/2024

Plans Approved To Refurb Wynyard Hall Spa

Construction News Image
Plans to refurbish and transform the lakeside Wynyard Hall Spa designed by GT3 Architects have been approved by Stockton-on-Tees Borough Council.

Nestled downhill from Wynyard Hall overlooking the lake, the spa is set to undergo an extensive transformation to expand its offering with more wet spa facilities and treatment rooms, as well as increased accessibility for users.

The approved plans will see the existing ground floor building extended, along with the introduction of a new-look outdoor space. New features will include an infinity pool and ice plunge pool, two barrel saunas, fit pit seating areas alongside two hot tubs, and external terraces. A café area accommodating 40 covers will be positioned on the lower floor by the lake, fostering fluidity of movement with easy access to outdoor seating spaces.

The lower floor will also feature changing rooms and indoor spa facilities, which include a herbal sauna, steam room, frigidarium, experience showers, salt therapy room, and plunge pools. A new-build upper-level will house six single and one double treatment rooms, a manicure room, and relaxation rooms.

-- Advertisement --
hss

Anna Cumberland, senior architect at GT3 Architects, said: "It's fantastic to see the design proposals for Wynyard Hall Spa now approved and we very much look forward to getting work underway and bringing the new facility to fruition.

"Everything we do is rooted in people architecture, making sure that every design is truly focused on the people who will interact with the space, whether that be as a visitor or staff. In the case of Wynyard Hall Spa, this includes improving accessibility to allow more people to visit. Readdressing the entrance and circulation around the spa facilities, as well as re-aligning the building levels, introducing a lift, and adding accessible parking with an access route will all improve the spa in its current form.

"The designs combine the luxury aesthetic expected by visitors with a sensitivity to the overall setting, particularly with the listed nature of Wynyard Hall and its gardens, which date back to the early 19th century. A clean and simple exterior using a buffbrick base to the lower level creates this cohesion with the setting, while a timber finish with feature glazing to the upper level adds a contemporary element which frames views across the grounds and creates an all-important connection to nature."

Taking inspiration from Nordic spa experiences, the building orientation takes spa users on a journey through their visit using the contrast of hot and cold, and dark and light alongside a blend of tactile materials. Meanwhile, close consultation with the spa manager ensured that the operational functions of the spa were considered and would be efficient for staff, while also not impacting the visitor experience.

The design team for the approved plans includes Southern Green Landscape Architects, Portland Consulting Engineers, TGA Consulting Engineers, SAJ Transport Consultants, and ELG Planning.

Latest Construction News

06/09/2024

The John Lewis Partnership (JLP) has submitted plans to transform a former distribution warehouse into rental housing. The proposals were submitted to Reading Borough Council. JLP's proposed regeneration of the site will see more than £80 million invested to create 215 high-quality and ...
06/09/2024

Morgan Sindall Construction has been appointed to develop Harlow's new multimillion pound Sustainable Transport Hub and Interchange, part of a programme of large-scale, town centre regeneration in the Essex town. Harlow Council's project to upgrade the facility is central to its plan to enhance ...
06/09/2024

Construction firm GRAHAM has installed a new bridge across the River Chelmer for client Chelmsford City Council. The two single-span bowstring arches weighing 110 tonnes were lifted into position by a 500-tonne crawler crane with the aid of a 280-tonne super lift for counterbalance. The arches had ...
06/09/2024

An official groundbreaking ceremony for the highly anticipated Lichfield Leisure Centre at Stychbrook Park has taken place. The event was graced by one of the most successful and celebrated British swimmers of all time, two-time Olympic gold medal winner Rebecca Adlington OBE, who joined ...
06/09/2024

Cambridge Investment Partnership (CIP) and housebuilder, The Hill Group, has secured plans to redevelop the ATS and Murketts site on Histon Road, Cambridge. The site, formerly home to the Murketts car dealership and an unused workshop area of the ATS commercial unit, will be transformed into a ...
06/09/2024

In response to the recent fire at a residential block in Dagenham and the final report from the Grenfell Tower Inquiry, National Access and Scaffolding Confederation (NASC) has released an essential Safety Bulletin. This document provides crucial guidelines for scaffolding contractors to ensure ...
05/09/2024

Contractor Speller Metcalfe has begun the renovation of the Grade-II listed Piano Building in the heart of Kidderminster town centre. Earlier this year, Wyre Forest District Council's Cabinet approved the acquisition of the Piano Building and the neighboring bus station. After a competitive ...
05/09/2024

Pembrokeshire County Council has scooped an additional £6.5million by the Welsh Government to be invested in building a new integrated health and social care hub in Pembroke. The grant has been awarded through the social care Integration and Rebalancing Capital Fund (IRCF) for the plans underway ...
05/09/2024

Road Management Services (RMS) has appointed VolkerFitzpatrick to oversee the renovation of the A13 River Lea Crossing. The project is a vital part of Transport for London's (TfL) ongoing initiative to develop a safer and more dependable road network. The £14 million project is a part of a ...
05/09/2024

Bellway has received planning permission for a new residential development of 90 new build homes in Croft, Warrington. Building on the success of previous developments in the area, the housebuilder will transform the 8.5 acre site off Deacons Close with an attractive mix of two, three and four ...
T & D Glazing And Installation LimitedLakeside HireThink Construction Skills Ltd.Aqua Direct LtdEfco UK LtdAqua Direct LtdBRICOFLOR UKStuart CanvasContainexNo Hydro
Terms and Conditions
2024/09/07 09:38:03