Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
Share this page
Construction News
25/07/2024

Plans Approved For £12m Extension At Bedford Academy

Construction News Image
Plans for a £12 million extension at Bedford Academy have been given the go-ahead.

The extension on Mile Road will see 16 state-of-the-art classrooms alongside changing rooms, a dining area, and community café added to the school's facilities.

The new classrooms will have a bright, safe and simple design, with whiteboards and ICT facilities, catering for an additional 300 students.

Following the extension, Bedford Academy is set to be one of the largest secondary schools in Bedford Borough, with ambitious plans to reach a total of 1,800 pupils by 2029.

The two-storey extension will operate to high energy efficiency levels with 'U Values' that ensure minimal heat loss through the facade of the building, as well as designed to achieve Net Zero Carbon in Operation.

Multi-disciplinary firm Pick Everard, operating through Perfect Circle and accelerated under the SCAPE Consultancy framework, has been appointed by Bedford Borough Council to project manage the scheme, alongside GSSArchitecture and Ashe Construction.

-- Advertisement --
hss

Sean Conneely, Director of project management at Pick Everard, said: "This is a fantastic opportunity to provide much-needed additional pupil places and facilities for the children of Bedford and the local community.

"Working collaboratively with the design and construction team, we have engaged with user groups to influence the design, and we will deliver a ‘Net Zero Carbon in Operation’ sustainable building ready for use in September 2025."

The versatility and flexibility of the space will allow Bedford Academy to function as a community hub outside of school learning hours for football, basketball, badminton, faith groups and dance schools.

The multi-use space will also include a kitchen, dining hall and community cafe with Wi-Fi and will be open to parents and visitors during evening and weekend activities, with space for up to 300 people in one sitting.

Chris Chapman, partner at GSS, said: "The building and materials have been carefully chosen to provide a modern and contemporary addition to Bedford Academy.

"We have listened to students, staff and local community groups to ensure that we have designed a modern sustainable building set in the heart of the local community, and we are looking forward to seeing it progress in the future."

A silent study area and office spaces for staff to work will be also included and 300 student lockers will be installed.

20 new car parking spaces, disabled parking and four electric vehicle spaces will be created. The school will also add 77 new cycle spaces to encourage sustainable travel to school.

The project is expected to be completed for the 25/26 school year.

Latest Construction News

06/09/2024

The John Lewis Partnership (JLP) has submitted plans to transform a former distribution warehouse into rental housing. The proposals were submitted to Reading Borough Council. JLP's proposed regeneration of the site will see more than £80 million invested to create 215 high-quality and ...
06/09/2024

Morgan Sindall Construction has been appointed to develop Harlow's new multimillion pound Sustainable Transport Hub and Interchange, part of a programme of large-scale, town centre regeneration in the Essex town. Harlow Council's project to upgrade the facility is central to its plan to enhance ...
06/09/2024

Construction firm GRAHAM has installed a new bridge across the River Chelmer for client Chelmsford City Council. The two single-span bowstring arches weighing 110 tonnes were lifted into position by a 500-tonne crawler crane with the aid of a 280-tonne super lift for counterbalance. The arches had ...
06/09/2024

An official groundbreaking ceremony for the highly anticipated Lichfield Leisure Centre at Stychbrook Park has taken place. The event was graced by one of the most successful and celebrated British swimmers of all time, two-time Olympic gold medal winner Rebecca Adlington OBE, who joined ...
06/09/2024

Cambridge Investment Partnership (CIP) and housebuilder, The Hill Group, has secured plans to redevelop the ATS and Murketts site on Histon Road, Cambridge. The site, formerly home to the Murketts car dealership and an unused workshop area of the ATS commercial unit, will be transformed into a ...
06/09/2024

In response to the recent fire at a residential block in Dagenham and the final report from the Grenfell Tower Inquiry, National Access and Scaffolding Confederation (NASC) has released an essential Safety Bulletin. This document provides crucial guidelines for scaffolding contractors to ensure ...
05/09/2024

Contractor Speller Metcalfe has begun the renovation of the Grade-II listed Piano Building in the heart of Kidderminster town centre. Earlier this year, Wyre Forest District Council's Cabinet approved the acquisition of the Piano Building and the neighboring bus station. After a competitive ...
05/09/2024

Pembrokeshire County Council has scooped an additional £6.5million by the Welsh Government to be invested in building a new integrated health and social care hub in Pembroke. The grant has been awarded through the social care Integration and Rebalancing Capital Fund (IRCF) for the plans underway ...
05/09/2024

Road Management Services (RMS) has appointed VolkerFitzpatrick to oversee the renovation of the A13 River Lea Crossing. The project is a vital part of Transport for London's (TfL) ongoing initiative to develop a safer and more dependable road network. The £14 million project is a part of a ...
05/09/2024

Bellway has received planning permission for a new residential development of 90 new build homes in Croft, Warrington. Building on the success of previous developments in the area, the housebuilder will transform the 8.5 acre site off Deacons Close with an attractive mix of two, three and four ...
Think Construction Skills Ltd.Aqua Direct LtdBRICOFLOR UKAqua Direct LtdStuart CanvasLakeside HireEfco UK LtdT & D Glazing And Installation LimitedContainexNo Hydro
Terms and Conditions
2024/09/07 18:24:48