Construction News
19/08/2024
Repair Work To Start To Protect Filey's Sea Wall
A £2.95 million repair scheme to protect Filey’s sea wall from future erosion is to begin next month.
North Yorkshire Council has secured a grant from the Environment Agency to carry out the project, which aims to ensure the sea defence remains viable for the next 50 years.
The scheme will cover a 1.1-kilometre stretch of the coast between Coble Landing in the north and Royal Parade in the south.
The defences were built between the 19th and 20th centuries, protecting 626 residential and 166 non-residential properties, as well as five Yorkshire Water assets, including sewage pumping stations.
Executive member for highways, transport and coastal protection, Cllr Keane Duncan, said: "We are pleased to be able to begin the essential repair scheme which will enhance the condition of the sea wall by replacing damaged blocks, slipways and steps.
"Extensive preparatory work has been carried out to ensure the stability of the wall and public safety. This includes comprehensive surveys and investigations to enable us to choose the best construction method and equipment.
"We are also addressing concerns around erosion at St Martins Gill where the slipway meets the softer undefended cliffs.
"These vital improvements aim to bolster the integrity and resilience of our coastal defences, ensuring better protection for our community, infrastructure, and coastline."
The council has worked closely with its delivery partner and local businesses to minimise disruption. The project is due to begin on 24 August, but construction won’t start until mid-September to avoid the peak tourist season.
The scheme is due to be completed by the spring of next year, and earlier this month Jackson Civil Engineering Limited was appointed to carry out the work.
For further information and to meet the team, a public engagement event will be held in the Concert Hall of the Evron Centre in Filey between 2pm and 8pm on Thursday 22 August.
North Yorkshire Council has secured a grant from the Environment Agency to carry out the project, which aims to ensure the sea defence remains viable for the next 50 years.
The scheme will cover a 1.1-kilometre stretch of the coast between Coble Landing in the north and Royal Parade in the south.
The defences were built between the 19th and 20th centuries, protecting 626 residential and 166 non-residential properties, as well as five Yorkshire Water assets, including sewage pumping stations.
Executive member for highways, transport and coastal protection, Cllr Keane Duncan, said: "We are pleased to be able to begin the essential repair scheme which will enhance the condition of the sea wall by replacing damaged blocks, slipways and steps.
"Extensive preparatory work has been carried out to ensure the stability of the wall and public safety. This includes comprehensive surveys and investigations to enable us to choose the best construction method and equipment.
"We are also addressing concerns around erosion at St Martins Gill where the slipway meets the softer undefended cliffs.
"These vital improvements aim to bolster the integrity and resilience of our coastal defences, ensuring better protection for our community, infrastructure, and coastline."
The council has worked closely with its delivery partner and local businesses to minimise disruption. The project is due to begin on 24 August, but construction won’t start until mid-September to avoid the peak tourist season.
The scheme is due to be completed by the spring of next year, and earlier this month Jackson Civil Engineering Limited was appointed to carry out the work.
For further information and to meet the team, a public engagement event will be held in the Concert Hall of the Evron Centre in Filey between 2pm and 8pm on Thursday 22 August.
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i