Construction News
05/09/2024
TRU Unveils New Images Of The Relocated Mossley Station
The Transpennine Route Upgrade (TRU) has unveiled new images of the relocated Mossley Station and the upgraded Greenfield Station in preparation for a public consultation set to begin on September 16, 2024.
TRU is proposing major upgrades across the section of the route between Stalybridge and Diggle (Saddleworth), including improved, more accessible stations at Mossley and Greenfield, full electrification of the line and various bridge works to allow the installation of overhead line equipment (OLE) to power faster, cleaner and more reliable trains.
The consultation on this area of TRU will close on 25 October 2024 and is a chance for the public to have their say. A virtual consultation room and feedback form will open on 16 September.
There will also be three in-person drop-in events to view the plans and speak with TRU staff:
• 18 September 2024 3pm-8pm St Peters RC Church, 119 Brierley Street, Stalybridge SK15 2E
• 19 September 2024 3pm-8pm Saddleworth Rangers RLFC, Shaw Hall Bank Road, Greenfield OL3 7LD
• 20 September 2024 3pm-8pm Mossley Methodist Church, Chapel Street, Mossley OL5 0EX
Mark Ashton, TRU Sponsor said: "The TRU Stalybridge to Diggle (Saddleworth) public consultation is the opportunity for the public to hear about our exciting plans for the area, which includes improved, more accessible stations at Mossley and Greenfield for the first time in the routes history.
"We want to bring the people of Stalybridge, Heyrod, Mossley, Greenfield, Uppermill and Diggle with us on this journey. I urge the local community and businesses to look at our plans through our virtual consultation room or at the in-person events and let us know their thoughts through our feedback form."
Mossley station is set to be relocated 300 metres northeast of the current station, in the direction of Greenfield. This will allow space to provide a better travel experience through an improved, more accessible station which will include a new footbridge and lifts. As well as improved accessibility, both Mossley and Greenfield stations will see platform extensions, giving the space for longer services to use the station, which would allow more seats for customers.
The public consultation will also present further details on the installation of OLE on the iconic Uppermill Viaduct, also known as Saddleworth Viaduct.
TRU is proposing major upgrades across the section of the route between Stalybridge and Diggle (Saddleworth), including improved, more accessible stations at Mossley and Greenfield, full electrification of the line and various bridge works to allow the installation of overhead line equipment (OLE) to power faster, cleaner and more reliable trains.
The consultation on this area of TRU will close on 25 October 2024 and is a chance for the public to have their say. A virtual consultation room and feedback form will open on 16 September.
There will also be three in-person drop-in events to view the plans and speak with TRU staff:
• 18 September 2024 3pm-8pm St Peters RC Church, 119 Brierley Street, Stalybridge SK15 2E
• 19 September 2024 3pm-8pm Saddleworth Rangers RLFC, Shaw Hall Bank Road, Greenfield OL3 7LD
• 20 September 2024 3pm-8pm Mossley Methodist Church, Chapel Street, Mossley OL5 0EX
Mark Ashton, TRU Sponsor said: "The TRU Stalybridge to Diggle (Saddleworth) public consultation is the opportunity for the public to hear about our exciting plans for the area, which includes improved, more accessible stations at Mossley and Greenfield for the first time in the routes history.
"We want to bring the people of Stalybridge, Heyrod, Mossley, Greenfield, Uppermill and Diggle with us on this journey. I urge the local community and businesses to look at our plans through our virtual consultation room or at the in-person events and let us know their thoughts through our feedback form."
Mossley station is set to be relocated 300 metres northeast of the current station, in the direction of Greenfield. This will allow space to provide a better travel experience through an improved, more accessible station which will include a new footbridge and lifts. As well as improved accessibility, both Mossley and Greenfield stations will see platform extensions, giving the space for longer services to use the station, which would allow more seats for customers.
The public consultation will also present further details on the installation of OLE on the iconic Uppermill Viaduct, also known as Saddleworth Viaduct.
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a