Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,062 companies....

Construction News

19/09/2024

Innovative New Real-Time Digital Assurance System Successfully Trialled

Construction News Image
An innovative new real-time digital assurance system, designed to improve the cost efficiency of tunnel installations and project delivery times, has been successfully trialled by Costain and i3D robotics (i3D), working with Tunnel Engineering Services (UK) Ltd (TES) and the Manufacturing Technology Centre (MTC).

The Digitally Assured Tunnel Assets - Information System (DATA-IS) takes advantage of automated construction processes and provides real-time quality and safety assurance of tunnelling fit-out services, such as cable wall brackets. It has been designed to help reduce the cost and time of re-work, which has been estimated to account for between 9% and 38% of total project costs in UK construction.

DATA-IS has successfully been trialled alongside ATRIS, an AI enabled, robotic tunnel installation system launched by the consortium earlier this year, which automates the process of bracket installation and reduces the health and safety risks associated with tunnel fit-outs.

Live data and information from the services installed by ATRIS is used to complete a digital assurance form to technically assure that an individual bracket has been installed successfully. At the same time, this information is uploaded to a digital twin simulation to provide a remote, real-time visual representation of a successful installation.

When combined, ATRIS and DATA-IS offer a fully automated tunnel installation and assurance solution, which can be integrated into modern day construction processes used across different infrastructure projects in road, rail, water and energy. 
-- Advertisement --
hss



Costain developed and implemented the digital twin technology and, along with i3D, managed the integration between the ATRIS and DATA-IS systems. i3D also developed the visualisation software used by ATRIS and optimised its usage for DATA-IS. The project was overseen by TES, with trials conducted at its special test tunnel facility in Heywood, Greater Manchester. MTC led the design and manufacture of the ATRIS end effectors and the robot's programming.

i3D was awarded funding for the project through the Department for Transport's 'First of a Kind 2023' innovation competition, delivered by Innovate UK. As part of the competition there was a specific focus on driving efficiencies in delivery of the railway's rail systems, which includes rails, track, signalling and electrics.

Tony Mallichan, digital growth lead for road and rail at Costain, said: "Technical and quality assurance is critical for the installation of mechanical and engineering services in tunnels. But conducting assurance in a tunnelling environment can be a time and labour-intensive process due to the confined space and limited entry or exit points, and can take many months to execute safely.

"Real-time assurance for capital infrastructure projects has the potential to transform efficiency across a project's lifecycle, providing greater value-for-money and mitigating risk. With the DATA-IS concept, it's now a reality. Working closely with our like-minded partners, we have made a real breakthrough – a system that provides technical and quality assurance at the point of installation.

"Working alongside the ATRIS robotics and AI installation system, it is now possible to automate the installation of tunnel services and instantly check the quality and safety of those services against industry benchmarks."

Dr Richard French, senior systems engineer at i3D, said: "Creating an innovative, robotics-based solution to install tunnel services infrastructure and improve worker safety enabled ATRIS to achieve game-changing success, complete with the successful application of machine learning and AI. The next logical step was to use all the available digital sensory data to help improve inspection and quality assurance, and to deliver paper-free asset handovers - a long-term ambition for the sector.

"Seeing our technology play a central role in meeting this ambition is hugely rewarding. We look forward to seeing its application across a range of industries and robotics and AI become an integral part of the construction process."

Latest Construction News

17/04/2025
Willmott Dixon has been selected by Oldham Council to build a new Visitor Centre and Forestry Skills Centre at Northern Roots, the UK's largest urban farm and eco-park. The development marks a major milestone in the transformation of 160 acres of green space at the heart of Oldham, part of the coun
17/04/2025
A groundbreaking ceremony has officially marked the commencement of construction for Versa, a state-of-the-art laboratory facility at King's Cross. The project, which is being delivered by Morgan Sindall Construction, has been commissioned by Kadans Science Partner, a prominent European investor s
17/04/2025
A major milestone has been reached on Skanska's A428 improvement scheme, as the project team connected the new A428 and B1040 roads over a newly constructed bridge and opened it to traffic last weekend. The achievement marks a crucial step forward in the project, enabling access to part of the main
17/04/2025
Our welfare unit hire division offers innovative ecowelfare units ready to be delivered nationwide and available in a range of configurations to accommodate 7, 12, or 15 persons with our most popular unit being our 12ft model fitted with advanced solar panels means there is no noise or vibrations f
17/04/2025
Huddersfield Station will temporarily close from Saturday 30 August to Monday 29 September 2025 to allow for a critical phase of engineering work as part of the Transpennine Route Upgrade (TRU). The closure will enable extensive track and platform remodelling at the Grade I listed station, which ha
17/04/2025
Visitors to Mumbles over the Easter holidays can now enjoy the transformed promenade, as major upgrades under the Mumbles Coastal Protection Project near completion. Contractors have begun laying a durable buff-coloured top surface, replacing the previously installed black Tarmac. The fresh finish
17/04/2025
Herefordshire Council has secured £1 million in funding from the government’s Public Sector Decarbonisation Scheme, to redevelop Hereford's Museum and Art Gallery into one of the most energy-efficient heritage public buildings in the UK. The funding will be used to install a low carbon heating syst
17/04/2025
David Lloyd Leisure, Europe's leading health, fitness and wellness group, has submitted a planning application to Wirral Council for a new club at Wirral Waters. The proposed club, set to create up to 100 permanent jobs upon completion, will be located at Peel Waters’ Bidston Dock site off Wallasey
16/04/2025
Pennyfarthing Homes has officially broken ground at Danes Park in New Milton, launching construction on a significant new residential development that will deliver 164 homes. To mark the milestone, directors from Pennyfarthing Homes welcomed Councillor Steve Davies, Portfolio Holder for Housing and
16/04/2025
GMI Construction Group is celebrating the official opening of Dakota Newcastle, the North East's first Dakota Hotel, situated on Newcastle's Quayside. The 118-room luxury boutique hotel, located at St Anne's Wharf, has welcomed its first guests and is poised to become a major addition to the region
Lakeside HireAqua Direct LtdBRICOFLOR UKStuart CanvasEfco UK LtdT & D Glazing And Installation LimitedTraining Courses 4 U LtdOnline Training Courses 4 UTardis Environmental UK LimitedMetal Sheets Ltd