Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 156,820 companies....

Construction News

09/10/2024

Screedflo Rapide Floor Screed

Construction News Image
This anhydrite screed has been tested at a 50mm depth and found to be dry to 75RH within 14 days. Please see the attached drying information and data sheet.

At 40mm a standard Screedflo screed in good drying conditions has been found to be dry in 28 days, but as most site conditions are not 20 degrees and 60RH, we say 40 days - 1mm per day.

Gypsol Rapide at 50mm, in comparison was found to be dry in half the time – 14 days, so in normal site conditions the drying time is likely to be half that of standard liquid screed.

Rapide is ideally suited to jobs that have no UFH. The benefit of Rapide is that it will significantly reduce the drying time of the screed, at most depths.

Rapide can also be laid with UFH, it will dry faster, but the UFH still needs to be commissioned.
-- Advertisement --
hss



If a 75mm standard screed is laid, and the UFH is used to force dry the screed, it is likely that two commissioning cycles will be needed, or the first commissioning cycle will need to be held for much longer at the high temperature to remove the moisture, which is expensive and can make the site uncomfortable to work in.

With Rapide, the 21 day cycle should be sufficient to thermally move the floor which is required before floor coverings are laid, and the 75mm screed should be dry.

Applications

Rapide can be laid at these minimum depths:

• 40mm with UFH

• 40mm on insulation

• 30mm on a membrane and slab

• 40mm on a timber floor

• 45mm on a timber floor with UFH

Screedflo Rapide virtually eliminates loose friable laitance, so no early sanding is required.

Once moisture testing is complete in line with BS8204:7:2003 and the screed is confirmed dry, the surface should be treated in line with the Contract Flooring Association requirements, the relevant British Standards and the advice of the adhesive manufacturers. Preparations remain the responsibility of the floor covering contractor and include lightly abrading the surface. This helps promote primer penetration, provides a key for adhesives and removes extraneous debris e.g. mortar, plaster and mud, and removes any loose friable laitance. It is generally unnecessary to remove the top surface of the screed to expose an aggregated finish.

Use our quick quote form for a speedy response.

Latest Construction News

05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre. The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area. The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic. The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre. The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment. The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes. The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road. The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall. Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs. The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund. The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a
Stuart CanvasT & D Glazing And Installation LimitedThink Construction Skills Ltd.Lakeside HireEfco UK LtdBRICOFLOR UKAqua Direct LtdMilestone FlooringAcra Screed LtdACS Construction Group