Construction News
11/10/2024
Morgan Sindall Completes Work On Wheeled Sports Zone
![Construction News Image](https://www.construction.co.uk/newsimages/1_312456_MorganSindall.jpg)
Morgan Sindall Construction has completed work on a new wheeled sports facility for Brighton & Hove City Council, as part of the broader redevelopment of Hove Beach Park.
Situated at the western edge of the project, near Hove Lagoon, this new seafront sports area includes a 600-square-metre roller area, a state-of-the-art skate park, and a 150-metre BMX pump track. Designed to cater to the entire community, the facilities accommodate all ages and skill levels, whether for rollerblading, skateboarding, or skating.
A new sports hub has also been handed over to BHCC for fit-out works to commence. Inside the complex, locals will be able to enjoy a new café with a terrace, public toilets and changing facilities as well as a new home for the Bowls Club. Once internal works are complete, the park will officially open in spring 2025.
This regeneration of underused green spaces will see the 40,000 metre-squared area restored with new trees and flowers, achieving a biodiversity net gain while creating a finished development that is welcoming to the community
In coordination with the skatepark design specialist Maverick Industries, the new Hove Beach Skate Park features spray concrete to deliver a smooth riding surface while complementing the surrounding natural landscape. The park includes seating and stair sets, a mini-ramp with extension, flatbanks, curved ledges, hubba ledges, and more exciting features for skate-enthusiasts.
Meanwhile, through collaboration with professional pump track designers, Velosolutions, the finished 145m pump track is surfaced with a bespoke smooth asphalt mix, designed to ensure that all wheelbases can roll seamlessly. With tightly spaced rollers and bermed corners, riders can generate speed without pedalling, appealing to cyclists and scooter riders alike. The inclusive design ensures that the track is accessible to beginners, while also offering advanced riders the opportunity to challenge themselves with technical manoeuvres.
The park's lighting, equipped with anti-spill hoods to prevent light from extending beyond the sports areas, will be operational later this year and function between 8am and 10pm. To conserve energy, motion sensors will control the lights, ensuring they are only switched on when the park is in use.
The well-used skatepark at Hove Lagoon has now closed, with the area set to be repurposed for the children’s rides and amusements which are currently located on the grass. This relocation will provide a larger green space for visitors to enjoy.
Guy Hannell, Area Director for Morgan Sindall Construction in the Southern Home Counties, said: "We're so proud to celebrate the completion of this skate park, the first of many exciting elements at Hove Beach Park. The team has worked exceptionally hard to bring this project to life, creating an area for the local community to come together and truly enjoy this green space.
"Our collaboration with Brighton and Hove County Council as well as Maverick Industries shines in the finished result, and we can’t wait to see some local skaters enjoy the ramps."
Situated at the western edge of the project, near Hove Lagoon, this new seafront sports area includes a 600-square-metre roller area, a state-of-the-art skate park, and a 150-metre BMX pump track. Designed to cater to the entire community, the facilities accommodate all ages and skill levels, whether for rollerblading, skateboarding, or skating.
A new sports hub has also been handed over to BHCC for fit-out works to commence. Inside the complex, locals will be able to enjoy a new café with a terrace, public toilets and changing facilities as well as a new home for the Bowls Club. Once internal works are complete, the park will officially open in spring 2025.
This regeneration of underused green spaces will see the 40,000 metre-squared area restored with new trees and flowers, achieving a biodiversity net gain while creating a finished development that is welcoming to the community
In coordination with the skatepark design specialist Maverick Industries, the new Hove Beach Skate Park features spray concrete to deliver a smooth riding surface while complementing the surrounding natural landscape. The park includes seating and stair sets, a mini-ramp with extension, flatbanks, curved ledges, hubba ledges, and more exciting features for skate-enthusiasts.
Meanwhile, through collaboration with professional pump track designers, Velosolutions, the finished 145m pump track is surfaced with a bespoke smooth asphalt mix, designed to ensure that all wheelbases can roll seamlessly. With tightly spaced rollers and bermed corners, riders can generate speed without pedalling, appealing to cyclists and scooter riders alike. The inclusive design ensures that the track is accessible to beginners, while also offering advanced riders the opportunity to challenge themselves with technical manoeuvres.
The park's lighting, equipped with anti-spill hoods to prevent light from extending beyond the sports areas, will be operational later this year and function between 8am and 10pm. To conserve energy, motion sensors will control the lights, ensuring they are only switched on when the park is in use.
The well-used skatepark at Hove Lagoon has now closed, with the area set to be repurposed for the children’s rides and amusements which are currently located on the grass. This relocation will provide a larger green space for visitors to enjoy.
Guy Hannell, Area Director for Morgan Sindall Construction in the Southern Home Counties, said: "We're so proud to celebrate the completion of this skate park, the first of many exciting elements at Hove Beach Park. The team has worked exceptionally hard to bring this project to life, creating an area for the local community to come together and truly enjoy this green space.
"Our collaboration with Brighton and Hove County Council as well as Maverick Industries shines in the finished result, and we can’t wait to see some local skaters enjoy the ramps."
![](https://www.construction.co.uk/newsimages/1_315943_stockport.jpg)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
![](https://www.construction.co.uk/newsimages/1_315945_vistry.jpg)
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
![](https://www.construction.co.uk/newsimages/1_315947_gateway14.jpg)
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
![](https://www.construction.co.uk/newsimages/1_315958_kirkby.jpg)
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
![](https://www.construction.co.uk/newsimages/1_315954_keepmoat.jpg)
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
![](https://www.construction.co.uk/newsimages/1_315951_driffield.jpg)
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
![](https://www.construction.co.uk/newsimages/1_315953_graham.jpg)
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
![](https://www.construction.co.uk/newsimages/1_315975_mezzanine.jpg)
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
![](https://www.construction.co.uk/newsimages/1_315978_weeton.jpg)
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
![](https://www.construction.co.uk/newsimages/1_315977_hartlepool.jpg)
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a