Construction News
15/10/2024
Leeds College Of Building Unveils £750k Campus Refurbishment
![Construction News Image](https://www.construction.co.uk/newsimages/1_312593_CampusRefurb.jpg)
Leeds College of Building's North Street Campus has undergone a £750,000 refurbishment, transforming the site into modern, accessible facilities for its construction students. The eight-week project, managed by award-winning fit-out specialists Lodestone Projects, revitalised four floors of the campus.
A key highlight is the conversion of the former library into a bright, open-plan student enrichment area. This space now features a gaming zone, TV lounge, meeting room, Student Services office, study areas with fixed seating, and a co-working bench. Designed to be inclusive and welcoming, the new area is located near the entrance for better accessibility.
The flexible layout also allows the space to be converted into an exam hall for up to 80 students, supporting the college's broader goal of creating a more inclusive and adaptable learning environment.
The reception and cafe area were upgraded into a larger communal zone with fresh decoration, flooring, power, and IT. Corridors and staircases across floors were also refreshed with new wall graphics and energy-efficient LED lighting.
The upper levels of the building were reconfigured to create a new learning resource centre, additional teaching spaces, teaching and support rooms, and a new staff training room in place of the old student common room.
Josh Donnelly, Joint Managing Director at Lodestone (recent winners of the Best Nationwide Refurbishment & Fit-Out Specialists in the UK Enterprise Awards 2024), said: "This has been such a rewarding and nostalgic project for Lodestone staff, given how many of our employees are current or former apprentices at Leeds College of Building. It was great to give something back to the institution that taught our professionals the skills needed to succeed in the construction industry. We’re thrilled with the results and hope the next generation of talent can benefit from these modern facilities as they learn their crafts."
The renovation project at North Street Campus is part of a comprehensive upgrade programme to align the site with the College's modern South Bank Campus. Alongside contractors Lodestone, design consultancy Fuse Studios oversaw the interior design with Turner & Townsend appointed for project and cost management.
Mike Harris, Director at Fuse Studios, said: "We were delighted to work alongside long-term clients Leeds College of Building, to refurbish its existing premises on North Street. The intention was to bring some of the design principles established with the College’s South Bank Campus buildings - also designed by Fuse Studios - to North Street, and so enrich the students’ learning environment. I’m delighted with the results and believe the project has successfully achieved its objectives, whilst moving towards the College’s aim of unifying its estates."
Ewan Shaw, Director at Turner & Townsend, added: "It was great to work with the team at the College and Fuse Studios once again to deliver such a fantastic campus renovation. Successful construction projects rely on teamwork, excellent communication, and trust amongst all of the partner teams and the North Street refurbishment was a great example of how this all came together to create such a fabulous learning facility."
A key highlight is the conversion of the former library into a bright, open-plan student enrichment area. This space now features a gaming zone, TV lounge, meeting room, Student Services office, study areas with fixed seating, and a co-working bench. Designed to be inclusive and welcoming, the new area is located near the entrance for better accessibility.
The flexible layout also allows the space to be converted into an exam hall for up to 80 students, supporting the college's broader goal of creating a more inclusive and adaptable learning environment.
The reception and cafe area were upgraded into a larger communal zone with fresh decoration, flooring, power, and IT. Corridors and staircases across floors were also refreshed with new wall graphics and energy-efficient LED lighting.
The upper levels of the building were reconfigured to create a new learning resource centre, additional teaching spaces, teaching and support rooms, and a new staff training room in place of the old student common room.
Josh Donnelly, Joint Managing Director at Lodestone (recent winners of the Best Nationwide Refurbishment & Fit-Out Specialists in the UK Enterprise Awards 2024), said: "This has been such a rewarding and nostalgic project for Lodestone staff, given how many of our employees are current or former apprentices at Leeds College of Building. It was great to give something back to the institution that taught our professionals the skills needed to succeed in the construction industry. We’re thrilled with the results and hope the next generation of talent can benefit from these modern facilities as they learn their crafts."
The renovation project at North Street Campus is part of a comprehensive upgrade programme to align the site with the College's modern South Bank Campus. Alongside contractors Lodestone, design consultancy Fuse Studios oversaw the interior design with Turner & Townsend appointed for project and cost management.
Mike Harris, Director at Fuse Studios, said: "We were delighted to work alongside long-term clients Leeds College of Building, to refurbish its existing premises on North Street. The intention was to bring some of the design principles established with the College’s South Bank Campus buildings - also designed by Fuse Studios - to North Street, and so enrich the students’ learning environment. I’m delighted with the results and believe the project has successfully achieved its objectives, whilst moving towards the College’s aim of unifying its estates."
Ewan Shaw, Director at Turner & Townsend, added: "It was great to work with the team at the College and Fuse Studios once again to deliver such a fantastic campus renovation. Successful construction projects rely on teamwork, excellent communication, and trust amongst all of the partner teams and the North Street refurbishment was a great example of how this all came together to create such a fabulous learning facility."
![](https://www.construction.co.uk/newsimages/1_315943_stockport.jpg)
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
![](https://www.construction.co.uk/newsimages/1_315945_vistry.jpg)
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
![](https://www.construction.co.uk/newsimages/1_315947_gateway14.jpg)
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
![](https://www.construction.co.uk/newsimages/1_315958_kirkby.jpg)
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
![](https://www.construction.co.uk/newsimages/1_315954_keepmoat.jpg)
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
![](https://www.construction.co.uk/newsimages/1_315951_driffield.jpg)
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
![](https://www.construction.co.uk/newsimages/1_315953_graham.jpg)
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
![](https://www.construction.co.uk/newsimages/1_315975_mezzanine.jpg)
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
![](https://www.construction.co.uk/newsimages/1_315978_weeton.jpg)
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
![](https://www.construction.co.uk/newsimages/1_315977_hartlepool.jpg)
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a