Construction News
29/10/2024
Work On £13m Expansion Project In Nottingham Complete
Clegg Construction has completed a £13 million expansion project at Carlton le Willows Academy which has created new space and improved learning environments.
The first phase of the development at the school in Gedling, Nottingham, involved building South Block - a new two-storey building to provide a state-of-the-art performance space, dining hall, 20 new classrooms, office space and a new main reception which has united the previously split site by linking the East and West buildings.
Designed by Welham Architects, South Block has recently been highly commended in the regional LABC (Local Authority Building Control) Building Excellence Awards.
Now the second part of the improvements - extensive alterations and refurbishment in various parts of the existing school, including the conversion of the previous dining area and assembly hall into additional teaching space – has also been completed.
It marks the fourth project Clegg Construction has undertaken in partnership with the academy.
Ross Crowcroft, pre-construction director at Clegg Construction, said: "Clegg Construction has had a long relationship with Carlton le Willows Academy, supporting the school in a number of improvement projects.
"We are delighted to have completed these latest two schemes, which provide additional first-class facilities for those already at the school, as well as allowing the school to expand the number of places it can offer to youngsters in the nearby community.
"As a Nottingham-based company, Clegg Construction takes particular pride in helping to improve the local education infrastructure and delivering facilities that will benefit future generations."
South Block created capacity for a further 300 extra students at Carlton le Willows Academy to meet increasing local demand for school places.
It features a range of smart technology to ensure long-term sustainability, including optimising natural light and using low-energy lighting throughout the building, natural ventilation and cooling, and underfloor heating.
As well as the new extension, the project involved the creation of a new car park for just under 100 cars, along with infrastructure for electric charging points. A sustainable drainage solution has also been installed as part of the groundworks, which included an attenuation tank aimed at avoiding any extra burden on the existing public sewers caused by rainwater.
Other members of the project team included local businesses: GNA Surveyors, Moran Structural Consultants and Integrated Energy Building Services (IEBS).
The development has been funded by Nottinghamshire County Council.
During the construction and renovation periods, Clegg Construction took part in a careers fair during the summer term to help students at Carlton le Willows Academy understand more about careers available in the construction industry.
The company has a long track record of delivering award-winning educational projects across primary and secondary schools, colleges, sixth form facilities and universities and has worked with Carlton le Willows since 2005 to create science labs, a resource centre, a music and drama extension, refurbish a library building, and build a Sixth Form centre complete with an ICT room and two teaching rooms.
Education schemes currently being delivered by Clegg Construction include the £9.6m Centre for Green Technology at Peterborough College – which is set to hand over early next year - as well as the £8.8m Future Tech Skills and Knowledge Exchange at West Nottinghamshire College, which is due for completion next summer.
The first phase of the development at the school in Gedling, Nottingham, involved building South Block - a new two-storey building to provide a state-of-the-art performance space, dining hall, 20 new classrooms, office space and a new main reception which has united the previously split site by linking the East and West buildings.
Designed by Welham Architects, South Block has recently been highly commended in the regional LABC (Local Authority Building Control) Building Excellence Awards.
Now the second part of the improvements - extensive alterations and refurbishment in various parts of the existing school, including the conversion of the previous dining area and assembly hall into additional teaching space – has also been completed.
It marks the fourth project Clegg Construction has undertaken in partnership with the academy.
Ross Crowcroft, pre-construction director at Clegg Construction, said: "Clegg Construction has had a long relationship with Carlton le Willows Academy, supporting the school in a number of improvement projects.
"We are delighted to have completed these latest two schemes, which provide additional first-class facilities for those already at the school, as well as allowing the school to expand the number of places it can offer to youngsters in the nearby community.
"As a Nottingham-based company, Clegg Construction takes particular pride in helping to improve the local education infrastructure and delivering facilities that will benefit future generations."
South Block created capacity for a further 300 extra students at Carlton le Willows Academy to meet increasing local demand for school places.
It features a range of smart technology to ensure long-term sustainability, including optimising natural light and using low-energy lighting throughout the building, natural ventilation and cooling, and underfloor heating.
As well as the new extension, the project involved the creation of a new car park for just under 100 cars, along with infrastructure for electric charging points. A sustainable drainage solution has also been installed as part of the groundworks, which included an attenuation tank aimed at avoiding any extra burden on the existing public sewers caused by rainwater.
Other members of the project team included local businesses: GNA Surveyors, Moran Structural Consultants and Integrated Energy Building Services (IEBS).
The development has been funded by Nottinghamshire County Council.
During the construction and renovation periods, Clegg Construction took part in a careers fair during the summer term to help students at Carlton le Willows Academy understand more about careers available in the construction industry.
The company has a long track record of delivering award-winning educational projects across primary and secondary schools, colleges, sixth form facilities and universities and has worked with Carlton le Willows since 2005 to create science labs, a resource centre, a music and drama extension, refurbish a library building, and build a Sixth Form centre complete with an ICT room and two teaching rooms.
Education schemes currently being delivered by Clegg Construction include the £9.6m Centre for Green Technology at Peterborough College – which is set to hand over early next year - as well as the £8.8m Future Tech Skills and Knowledge Exchange at West Nottinghamshire College, which is due for completion next summer.
05/02/2025
Stockport Mayoral Development Corporation (MDC) and ECF, a joint venture between Homes England, Legal & General, and Muse, have selected Vinci as the preferred contractor for Phase 1 of Stockport 8, a £350 million residential development west of Stockport town centre.
The decision follows a competi
05/02/2025
Vistry Group has finalised contracts for a significant housing development in Hinckley, Leicestershire, securing outline planning permission to deliver 475 new homes in the area.
The development, located east of Stoke Road and north of Normandy Way in the town's northern region, has a projected val
05/02/2025
Wilten Construction has been awarded a second Design and Build contract at Gateway 14 by client Gateway 14 Ltd and Jaynic.
The project involves the development of a state-of-the-art, three-storey Skills and Innovation Centre spanning 35,000 sq ft in the heart of Gateway 14. Designed to achieve BREE
05/02/2025
Knowsley Council has approved a major housing development in Kirkby, giving the green light to 800 new energy-efficient homes in the town's centre.
The decision also secures £7.7 million in Section 106 contributions from developer Barratt David Wilson Homes, further boosting local investment.
The
05/02/2025
Keepmoat Homes has announced plans to invest over £50 million in three new housing developments across Calderdale, aiming to deliver more than 200 new homes.
The developments, undertaken in partnership with Calderdale Council, form part of the North Halifax Transformation Programme, a local authori
05/02/2025
Essential renewal work at Skerne Road level crossing in Driffield has been completed. Over a six-day period, engineers replaced decades-old equipment, installing a state-of-the-art operating system, replacing the level crossing deck, and resurfacing the road.
The newly installed operating system is
05/02/2025
Construction firm GRAHAM is currently carrying out essential restoration work at the National Railway Museum in York, replacing the Grade II listed roof structure at Station Hall.
Originally built between 1875 and 1877 as a goods station, Station Hall now houses the museum’s six royal carriages.
05/02/2025
Mezzanine floors are commonly associated with additional storage or expanded floor space, but did you know they can also have a profound impact on employee productivity and morale? At Doity Engineering, we specialise in designing and installing mezzanine floors for
05/02/2025
Construction work is commencing on a new solar array at Weeton Barracks in Lancashire that will generate over one third of the site’s energy needs.
The work has been funded under the British Army’s Project Prometheus, a scheme that is increasing renewable energy across the army estate through inst
05/02/2025
The regeneration of Hartlepool's waterfront has reached a significant milestone with a £631,000 grant from The National Lottery Heritage Fund.
The funding will support the development phase of the 'Tides of Change' project, aimed at transforming the visitor experience at the Museum of Hartlepool a