Construction News
20/06/2007
Knight Frank Wins Contract To Build £6M Office For Hydril
Knight Frank has been appointed to design and project manage the construction of a new £6 million Headquarters facility for Hydril UK Ltd, at Altens East Industrial Estate in Aberdeen.
Knight Frank’s Building Consultancy department in Aberdeen submitted a detailed planning application to Aberdeen City Council on 1 March 2007, to construct a new build 11,000 sq ft office and a 49,000 sq ft workshop/warehouse on an 8.3 acre site at Altens East Aberdeen on behalf of Hydril UK.
The surrounding site of the office and warehouse will be used as a pipe storage yard for Hydril UK’s primary business of threading premium connections for casing, tubing and drill pipe used in oil and gas wells. This new development will see Hydril relocate its existing facilities (also within Altens) to the new site allowing its manufacturing processes to be streamlined and production output increased.
Knight Frank will be providing a turnkey professional service to Hydril UK and will be directly involved in the architectural design, project management and planning supervisor services.
Doug Garden, Partner at Knight Frank, said: “This is an exciting opportunity to design and develop an office and warehouse facility for Hydril, which has had a base in Aberdeen for many years. With work expanding and their existing facility becoming stretched, Hydril needed more space to continue progressing their business. This new HQ facility at Altens East will provide them with fantastic space from which to operate and grow the business.”
Work is scheduled to commence in the Autumn of this year with a projected completion date of August 2008.
(CD)
Knight Frank’s Building Consultancy department in Aberdeen submitted a detailed planning application to Aberdeen City Council on 1 March 2007, to construct a new build 11,000 sq ft office and a 49,000 sq ft workshop/warehouse on an 8.3 acre site at Altens East Aberdeen on behalf of Hydril UK.
The surrounding site of the office and warehouse will be used as a pipe storage yard for Hydril UK’s primary business of threading premium connections for casing, tubing and drill pipe used in oil and gas wells. This new development will see Hydril relocate its existing facilities (also within Altens) to the new site allowing its manufacturing processes to be streamlined and production output increased.
Knight Frank will be providing a turnkey professional service to Hydril UK and will be directly involved in the architectural design, project management and planning supervisor services.
Doug Garden, Partner at Knight Frank, said: “This is an exciting opportunity to design and develop an office and warehouse facility for Hydril, which has had a base in Aberdeen for many years. With work expanding and their existing facility becoming stretched, Hydril needed more space to continue progressing their business. This new HQ facility at Altens East will provide them with fantastic space from which to operate and grow the business.”
Work is scheduled to commence in the Autumn of this year with a projected completion date of August 2008.
(CD)
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i