Construction News
31/03/2008
Gleeds Awarded Key Role In St Pancras Chambers' Revamp
Gleeds, the International Management and Construction Consultancy, has been appointed by Manhattan Loft Corporation (MLC) to provide Cost Management and Project Management services for the £100 million conversion of the Grade I listed St Pancras Chambers, London, where work has just begun.
The gothic style St Pancras Chambers, formerly the Midland Grand Hotel, is situated in front of the new International St Pancras Railway Station. MLC are working with London and Continental Railways to convert and restore the magnificent building, that has been empty since the 1980's, into a 245 bedroom luxury hotel, complete with 67 modern apartments. The original hotel will house 54 rooms while a new five-storey extension will be created at the rear of the building to take care of the remaining hotel accommodation.
The works, to be carried out in accordance with National Heritage guidelines, will include faithfully restoring the principal public rooms on the lower floors together with refurbishing the spectacular existing staircase. The upper floors will be converted to accommodate new modern apartments, with the design ensuring the retention of the dramatic 19th Century ornate surroundings. The scheme will take place across three phases, with phase one converting part of the existing St Pancras Chambers into residential apartments, whilst phase two will transform the remaining space into Hotel accommodation.
The last phase will involve the construction of a new Hotel to the West Wing of the building, with project completion aimed for 2011.
(CD/JM)
The gothic style St Pancras Chambers, formerly the Midland Grand Hotel, is situated in front of the new International St Pancras Railway Station. MLC are working with London and Continental Railways to convert and restore the magnificent building, that has been empty since the 1980's, into a 245 bedroom luxury hotel, complete with 67 modern apartments. The original hotel will house 54 rooms while a new five-storey extension will be created at the rear of the building to take care of the remaining hotel accommodation.
The works, to be carried out in accordance with National Heritage guidelines, will include faithfully restoring the principal public rooms on the lower floors together with refurbishing the spectacular existing staircase. The upper floors will be converted to accommodate new modern apartments, with the design ensuring the retention of the dramatic 19th Century ornate surroundings. The scheme will take place across three phases, with phase one converting part of the existing St Pancras Chambers into residential apartments, whilst phase two will transform the remaining space into Hotel accommodation.
The last phase will involve the construction of a new Hotel to the West Wing of the building, with project completion aimed for 2011.
(CD/JM)
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i