Construction News
11/12/2008
2012 VeloPark Site Moving Up A Gear
Plans for new world-class cycling facilities in London for cyclists of all ages and abilities have moved a step closer as new images released by the Olympic Delivery Authority (ODA) today show the site of the London 2012 VeloPark taking shape.
Work to prepare the VeloPark site for the start of construction began in August last year. New images released today show the footprint of the Velodrome clearly visible with a bowl created for the cycle track approximately 4m deep and 60m wide by 100m long. Some 48,000 cubic metres of material was excavated to create the bowl, enough to fill 19 Olympic-sized swimming pools. Construction work on the Velodrome will start early next year with concrete piles, up to 20 metres deep, installed in the ground to create the foundations of the Velodrome building.
ODA Chairman John Armitt said: "These latest images show the huge progress we are making on the VeloPark site, keeping us firmly on track to start construction work on this landmark new venue for London early next year.
"Our VeloPark plans are driven by legacy and together with creating a world-class stage for elite athletes in 2012, the VeloPark will deliver facilities for a new generation of cyclists of all ages and abilities."
The VeloPark, to be based in the north of the Olympic Park, will include a 6,000 seat Velodrome to host the London 2012 Olympic and Paralympic indoor track cycling events as well as a BMX circuit for Olympic events. After the Games, a road cycle circuit and mountain bike course will be added to create a legacy VeloPark that will combine cycling facilities across all disciplines in one cycling 'hub'.
Work to prepare the VeloPark site for the start of construction began in August last year. New images released today show the footprint of the Velodrome clearly visible with a bowl created for the cycle track approximately 4m deep and 60m wide by 100m long. Some 48,000 cubic metres of material was excavated to create the bowl, enough to fill 19 Olympic-sized swimming pools. Construction work on the Velodrome will start early next year with concrete piles, up to 20 metres deep, installed in the ground to create the foundations of the Velodrome building.
ODA Chairman John Armitt said: "These latest images show the huge progress we are making on the VeloPark site, keeping us firmly on track to start construction work on this landmark new venue for London early next year.
"Our VeloPark plans are driven by legacy and together with creating a world-class stage for elite athletes in 2012, the VeloPark will deliver facilities for a new generation of cyclists of all ages and abilities."
The VeloPark, to be based in the north of the Olympic Park, will include a 6,000 seat Velodrome to host the London 2012 Olympic and Paralympic indoor track cycling events as well as a BMX circuit for Olympic events. After the Games, a road cycle circuit and mountain bike course will be added to create a legacy VeloPark that will combine cycling facilities across all disciplines in one cycling 'hub'.
17/01/2025
Leeds Trinity University has officially opened its newly refurbished City Campus at 1 Trevelyan Square in Leeds.
Completed by GRAHAM Interior Fit-Out, the transformation of the central Leeds site introduces state-of-the-art facilities designed to improve learning and collaborate with industry partn
17/01/2025
Trammell Crow Company (TCC) has secured planning permission for a Grade A logistics scheme in Heywood, Greater Manchester, following a successful planning appeal.
The development will feature two state-of-the-art industrial and logistics buildings. One building will house two units measuring 4,796
17/01/2025
Poole-based developer AJC Group has celebrated a record-breaking 2024, delivering 100 affordable homes, a significant increase from the 72 units completed in the previous year.
Since 2023, AJC Group has completed and handed over 172 affordable homes across five sites.
In 2024 alone, the developer
17/01/2025
Plans for one of the most ambitious parks projects in London have taken a significant step forward, with Haringey Council securing nearly two additional acres of land around The Paddock nature reserve in Tottenham Hale.
The agreement with Thames Water marks a major milestone in the transformation o
17/01/2025
Islington Council has unveiled two draft guidance documents aimed at helping residents, businesses, and developers combat climate change by making buildings more energy efficient and fostering a greener, healthier borough.
The consultation seeks feedback on the draft Climate Action Supplementary Pl
17/01/2025
The City of Wolverhampton Council has unveiled a £98 million investment plan over the next five years to develop around 500 new homes across the city.
The proposal, part of the Housing Revenue Account (HRA) Business Plan, received Cabinet approval this week and now moves to Full Council for final
17/01/2025
Croydon Council has announced a significant milestone in the redevelopment of the Purley Pool site, with revised proposals submitted for a new leisure centre, later living housing, and the regeneration of the surrounding area.
A planning application for the site was initially submitted in 2024, pro
17/01/2025
The City of Wolverhampton Council has announced that demolition work has commenced on the New Park Village estate, marking the start of a major £40 million redevelopment project to transform outdated council housing.
Contractor DSM Demolition has begun pulling down poor-quality bungalows on Valley
17/01/2025
Hillingdon Council has acquired 12 new homes at Carpenters Court in Uxbridge.
Leader of Hillingdon Council, Cllr Ian Edwards and Cllr Steve Tuckwell, Cabinet Member for Planning, Housing and Growth, visited the site to officially mark the handover of the properties from local developer Kearns Devel
17/01/2025
Organisers of UK Construction Week (UKCW) have announced another major coup for the show's 10th anniversary year, with the news that UKCW London will be co-locating with the 14th edition of The Stone Show & Hard Surfaces, the principal industry event for surface design.
Established 26 years ago, th