Subscribe to our Construction Newsfeed
UK Construction Directory
Search our 157,098 companies....

Construction News

07/05/2009

Defending Against Limescale With Military Precision

Construction News Image
The Royal Military College of Science in Shrivenham, also known as Cranfield University, has long been considered a centre of academic excellence, offering the expertise of both Academia and Officers of the British Armed Forces in the teaching of Defence Management, Science and Technology.

The Royal Military College's Centre for Defence Chemistry has an extensive range of well-equipped laboratories offering facilities for all aspects of teaching and research into the chemical sciences.

A regular supply of distilled water is essential in all chemistry laboratories, and the Royal Military College is no exception, with the chemistry lab producing its own distilled water from domestic water using electrically heated 10litre stills. Being in a hard water area, the scientists at the Royal Military College found that limescale deposits were building up rapidly on the stills, resulting in them becoming less effective.

To combat the limescale problem, the stills were regularly dismantled, and acid was used to remove the scale from the glass vessels and heating elements. However, repeated acid cleaning was causing damage to the outer metal surface of each element, making it less effective and reducing its life.
-- Advertisement --
hss



Therefore, the scientists at the Royal Military College turned to non-chemical alternatives to treat the hard water, and finding none they had tested to work effectively, the Hydroflow HS38 unit was recommended. The Shrivenham team decided to carry out comparative performance tests, so the Hydroflow HS38 was installed on a limescale free still and observations made over a 6 week period. The still was then cleaned, re-used for a second six-week period without the Hydroflow HS38, and fresh measurements taken.

The tests confirmed that calcium carbonate crystals formed quickly on heating elements as the water contained more dissolved material than could be held, meaning it was at the point of super-saturation. In comparison, when the Hydroflow HS38 was in operation, crystals grew larger and more quickly, but crystallized onto the floating 'Hydroflow Crystals' and remained in suspension as opposed to adhering to the heating element or glass. Furthermore, whilst the HS38 was in use, the water was maintained at saturation point.

Hydropath's HS38 prevents the build up of all limescale deposits, including calcium carbonate, by emitting randomly varying electric fields throughout the system. The result is the production of nuclei throughout the water system.

When the water is heated, the resulting precipitate that usually deposits on hot surfaces grows in suspension and develops as a crystal on the nuclei, which is then washed away in the flow. The fields treat the water both up and down stream and will be transmitted into the central heating system to treat the primary water. The treated water is normally able to dissolve existing scale in just a few months.

Since the Hydroflow HS38 eliminated the need for acid cleaning and the still no longer needs to be dismantled, it saves a lot of time for the team at the Royal Military College. Hydroflow HS38 units have now been permanently fitted to all their laboratory stills.

For information about Hydropath’s range of water conditioners Tel: (0115) 986 9966.

Latest Construction News

25/04/2025
Aston Villa Football Club has unveiled plans to refurbish and expand the iconic North Stand at Villa Park, a major step in the wider regeneration of the North Grounds. The redevelopment will raise the stadium's total capacity to over 50,000, with the North Stand alone increasing to more than 12,00
25/04/2025
Morgan Sindall Construction's Southern Home Counties team has officially handed over the newly completed Crawley Innovation Centre to Crawley Borough Council (CBC). The transformation of the former TUI travel house into a cutting-edge innovation, economic and technology hub drew local leaders, busi
25/04/2025
Clowes Developments has confirmed that construction will soon commence on five new trade counter, warehouse and industrial units at Stud Brook Business Park in Castle Donington, following planning approval from North West Leicestershire District Council. The new development, Plot 1, will feature fi
25/04/2025
A historic 18th-century landmark has been carefully restored as part of the major Garendon Park housing development in Loughborough. The Grade II* listed Obelisk, located within the grounds of the former Garendon Hall estate, had endured years of weathering before undergoing a sensitive restoration
25/04/2025
Mace has appointed industry heavyweight, Gary Sweeney, to head up its European team working across the Healthcare, Life Sciences and Technology sectors. Gary joins Mace following a spell as Interim Director in Turner & Townsend’s Advanced Manufacturing, Industrial and Logistics division in the UK
25/04/2025
A groundbreaking ceremony has recently marked the start of a £5.5 million extension project at Thorp Academy in Ryton, Gateshead. The development, aimed at accommodating the growing student population, is being delivered by Morgan Sindall Construction on behalf of the Northern Education Trust (NET
25/04/2025
Wakefield-based Henley Stone Specialists has been appointed to deliver Glass Reinforced Concrete (GRC) elements for the first phase of 'Our Cultural Heart', Kirklees Council’s flagship project aimed at revitalising Huddersfield town centre. Part of the Henley Construction Management Group, Henley S
25/04/2025
More than 2,500 Nottingham homes are set to benefit from energy efficiency improvements as part of a major £153 million regional initiative to cut household bills and carbon emissions. Nottingham City Council's Executive Board has approved the acceptance of nearly £76 million in Government funding
25/04/2025
Introduction: What Is a Fitted Hoist? A fitted hoist is a mechanical lifting device installed in the home to help safely move individuals with limited mobility. Commonly found in bedrooms, bathrooms and living spaces, these systems make it easier and safer to transfer someone between a bed, chair,
25/04/2025
Rail services between Hereford and Shrewsbury are facing significant disruption following the collapse of an underground culvert, forcing the closure of the line in both directions. Emergency engineering works are underway to ensure the safety of the railway. Network Rail's engineering teams are
T & D Glazing And Installation LimitedStuart CanvasLakeside HireEfco UK LtdAqua Direct LtdTraining Courses 4 U LtdOnline Training Courses 4 UTardis Environmental UK LimitedMetal Sheets LtdActive Planning Leads