Construction News
20/08/2009
Major Landmark Reached On Hospital Project
State-of-the-art facilities designed and built by Costain are coming into service at Cheltenham General Hospital as the Gloucestershire NHS Foundation Trust improves its services for its patients.
The £13.5 million St Luke’s Wing Phase 2 was officially opened in July, while a building housing a linear accelerator enhancing services for cancer treatment is due for completion in early September.
The four-storey St Luke's wing extension houses stroke and rehabilitation wards, plus an intensive care and high dependency unit. Project manager Kevin Miners
explained that the new structure was slotted into a gap between two existing buildings and then linked in to existing services all within an extremely tight area.
Working on a 'live' hospital site naturally meant minimising noise, dust and disruption, with much work on the 82-week job taking place at weekends and late at
night.
Mr Miners said: "There was a lot of close liaison with the hospital trust. We were connecting to a lot of existing services, and had to break in to their live systems."
The second building, a two-storey structure housing a Linear Accelerator, features a concrete 'bunker' designed to house the accelerator, which emits radiation as it is used in cancer treatment.
Construction Manager Alex Garwood-Gowers said: "We built big concrete boxes, effectively, with walls up to 2.4 metres thick. The concrete was of higher than normal density, achieved by adding magnetite, a type of iron oxide. The floor, walls and roof of the bunker each had to be completed in single pours, to prevent any joints that could allow radiation to leak."
(CD/KMcA)
The £13.5 million St Luke’s Wing Phase 2 was officially opened in July, while a building housing a linear accelerator enhancing services for cancer treatment is due for completion in early September.
The four-storey St Luke's wing extension houses stroke and rehabilitation wards, plus an intensive care and high dependency unit. Project manager Kevin Miners
explained that the new structure was slotted into a gap between two existing buildings and then linked in to existing services all within an extremely tight area.
Working on a 'live' hospital site naturally meant minimising noise, dust and disruption, with much work on the 82-week job taking place at weekends and late at
night.
Mr Miners said: "There was a lot of close liaison with the hospital trust. We were connecting to a lot of existing services, and had to break in to their live systems."
The second building, a two-storey structure housing a Linear Accelerator, features a concrete 'bunker' designed to house the accelerator, which emits radiation as it is used in cancer treatment.
Construction Manager Alex Garwood-Gowers said: "We built big concrete boxes, effectively, with walls up to 2.4 metres thick. The concrete was of higher than normal density, achieved by adding magnetite, a type of iron oxide. The floor, walls and roof of the bunker each had to be completed in single pours, to prevent any joints that could allow radiation to leak."
(CD/KMcA)
29/01/2025
Caddick Construction has been awarded a £43 million contract to deliver the first phase of Cole Waterhouse's flagship regeneration scheme in Digbeth, Birmingham.
The project, known as Upper Trinity Street, marks a significant step in the area’s transformation.
Spanning 182,986 square feet, the re
29/01/2025
McLaren Construction has been appointed by O&H Properties to deliver the first phase of a £60 million Foster & Partners-designed development at the corner of New Bond Street and Grafton Street in London’s West End.
The seven-storey, 5,400 square metre prime retail and office scheme will feature ret
29/01/2025
GMI Construction Group has been awarded a contract to develop three high-specification warehouse units totalling over 175,000 square feet at Precedent Drive, Milton Keynes.
The £20 million project, commissioned by DV5 Last Mile Developments (UK) Ltd, a joint venture between Coltham and Delancey Re
29/01/2025
Plans for 106 sustainable new homes in Southville, a neighbourhood in South Bristol, have been approved as the city seeks to increase housing delivery to address growing demand.
Top 10 award-winning housebuilder The Hill Group will create a £60 million development on Raleigh Road, on land that was
29/01/2025
Bouygues UK has reached a major milestone in the fourth phase of the Hallsville Quarter regeneration project in Canning Town, London.
The project, part of the £3.7 billion Canning Town and Custom House Regeneration Programme, recently held a topping out ceremony, marking the completion of the 11-s
29/01/2025
Willmott Dixon Interiors is carrying out a significant upgrade to the roof of the National Maritime Museum in Greenwich, one of London's most iconic cultural landmarks.
As part of the £12 million project, the company is installing over 23,000 square feet of sun-protected glazing above the museum’s
29/01/2025
Equans has been appointed by Babergh and Mid Suffolk District Councils to carry out crucial decarbonisation work across the councils' housing stock, using funding secured through the Social Housing Decarbonisation Fund (SHDF).
The councils used the South East Consortium's Zero Carbon Framework to s
29/01/2025
In the world of construction, the quest for energy efficiency and sustainability is ever-evolving. Among the array of solutions available, EPS (Expanded Polystyrene) insulation stands out as a versatile and effective option for enhancing the thermal performance of buildings, particularly when used f
29/01/2025
BCP Council has completed significant coastal protection works at Hamworthy Park, ensuring its resilience against erosion for the next 20 years.
A 200-metre stretch of sea wall along the eastern promenade has been reinforced using low-carbon concrete, while new steps have been constructed to improv
29/01/2025
Geo-environmental consultancy and remediation contractor, The LK Group, has strengthened its team with a trio of recruits.
The multidisciplinary company's latest raft of hires comprises a new director, associate director and remediation manager.
The geo-environmental specialist, headquartered i