Construction UK Construction Directory
Time and date
CONSTRUCTION DIRECTORY
PLR Ltd London
Dig and dump eradication
PLR offer a complete total package solution providing the plant (machinery), transportation and disposal needed to clear your land.

We are Environmental Agency approved and fully licensed controlled waste carriers, so you can be sure your land will be cleared.

Soil screening
With this option, the Japanese Knotweed contaminated soil is filtered on site leaving clean backfill on your site.

Please note this solution is dependent on soil type and site conditions.

Cell burial
Instant and economical method, restrictions such as site size, water levels and the area to be developed will need to be taken into consideration.

On site stock pile/relocation
With this process, Japanese knotweed is excavated and relocated on site to a new location distanced from the development area and then it eradicated in-situ in its new on site location.

Please note this method is reliant on the dimensions of the site and is not suitable for smaller sized developments.

Geo-textile non-permeable membranes
If an engineering solution is necessary we provide a proven protective barrier to prevent reinfestation. Membranes can be used independently or in combination with all PLR eradication methods depending on site requirements and constraints.

PLR Ltd London
1st Floor Holborn Gate
33 High Holborn
London
WC1V 7QT
BRICOFLOR UKNo Hydro123v PlcForge Lifts LtdAtlas Winch & Hoist Services Ltd (UK)Landscaping CambridgeMy Thread Curtains(London) Builder Cambridge LtdElectrical Test Midlands LtdMaccaferri Ltd
Terms and Conditions
2024/11/23 11:02:34