Time and date
CONSTRUCTION DIRECTORY
G A P Architectural & Engineering Design Services
At Gap Architectural & Engineering Design Services we ensure that the project is as close to the initial concept as possible. Therefore we use the following steps;
Our first consultation which is usually free¹ where we will:
- Meet with the client to ascertain clients' intentions and requirements and determine if any specialist sub-consultants will be required e.g. Aboriculturalist, Ecologists, Hydrologists, Structural Engineers...
- Outline the terms of engagement and if possible provide a fee proposal.
- Issue a Memorandum of Agreement.
- If required and appropriate undertake a full site appraisal.
- Discuss with the Local Authority Planning Department of the viability of the proposals and advise client of any negative outcomes.
- Prepare initial drawings.
- Meet clients and discuss drawings.
- Make any minor alterations required by Client.
- Submit to client for final approval.
- Make any subsequent changes as required by the Client².
- Prepare Application Documentation.
- Submit application.
- Make any minor changes required by the Planning Officer to sweeten the planning process, including speaking at the Planning Committee if permitted and required.
- Deal with as many of the Planning Conditions as practicable.
G A P Architectural & Engineering Design Services
22 Ty Isaf Bungalows
Penyrheol
Caerphilly
CF83 2RG
Penyrheol
Caerphilly
CF83 2RG